07:39 02 Jul 25
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
9981-10000
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Run-of-the-river Hydroelectric Power Project on Baitarani river in Orissa. | Baitarani Power Project Pvt. Ltd. Hyderabad | India | 12 Apr 2010 |
Kohinoor Wind Power Project in Rajasthan | Kohinoor Planet Constructions Pvt. Ltd. | India | 12 Apr 2010 |
Modi'in Landfill Project | Eco Traders Ltd. | Israel | 12 Apr 2010 |
Forestation of wastelands | Saran Renewable Energy Pvt. Ltd. | India | 12 Apr 2010 |
Chenergy Fangzheng County Hutieling Wind Power Project | Heilongjiang Chenergy Fangzheng Wind Power Co., Ltd. | China | 12 Apr 2010 |
Zhongyu Fanzheng County Gaoleng Wind Power Project | Heilongjiang Zhongyu Fangzheng Wind Power Co., Ltd. | China | 12 Apr 2010 |
Wuxi Tovo waste heat recovery from sulphuric acid production for steam generation | Wuxi Tovo Chemical Power Co.,LTD | China | 11 Apr 2010 |
Municipal Solid Waste treament project in Howrah by KGEPL | KRL-SIL Green Energy Private Limited | India | 10 Apr 2010 |
R.S.J.Ozone BUNDLED WIND FARM CDM PROJECT, Phase II | M/s R.S.J Ozone Private Limited | India | 10 Apr 2010 |
Biogas based power generation project by Gujarat Ambuja Exports Limited | Gujarat Ambuja Exports Ltd | India | 10 Apr 2010 |
Barvi Hydro Electric Power Project in Maharashtra, India | Madhav Vasistha Hydro Power Private Limited | India | 09 Apr 2010 |
0.60 MW Wind Power CDM Project by Alpha Flock (India) Pvt., Ltd. Pune- Maharashtra, India | Alpha Flock (India) Pvt. Ltd. | India | 09 Apr 2010 |
Additions to Cement Project : Cementos Pacasmayo | Cementos Pacasmayo S.A.A | Peru | 09 Apr 2010 |
Coal Bed Methane Fuel Switch Project at PCBL Durgapur Plant | Phillips Carbon Black Limited | India | 09 Apr 2010 |
Feed Switch from FO/LSHS to Natural Gas for Ammonia & Urea Manufacture at Bhatinda 2 | National Fertilizers Limited | India | 09 Apr 2010 |
Feed Switch from FO/LSHS to Natural Gas for Ammonia & Urea Manufacture at Bhatinda 1 | National Fertilizers Limited | India | 09 Apr 2010 |
Methane recovery from Palm Oil Mill Effluent atPT. Golden Blossom Sumatra | PT. Gozco Plantations | Indonesia | 09 Apr 2010 |
Huaibei Zhuxianzhuang CMM Utilization Project | Huaibei Mining (Group) Co., Ltd. | China | 09 Apr 2010 |
6 MW WHRB Power Plant at Sitara, Raipur by M/s. Baldev Alloys Pvt. Ltd | Baldev Alloy Pvt Ltd | India | 09 Apr 2010 |
KPLC Efficient Lighting CDM Project | Kenya Power & Lighting Company Limited | Kenya | 09 Apr 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: