Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 435 | 436 | 437 | 438 | 439 | ... 669 >>
Displaying 8721-8740 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Wind Power Project by RSGBL Riddhi Siddhi Gluco Biols Limited India 28 Aug 2010
Xinjiang Kashi River Taledesayi Hydropower Project Guodian Xinjiang Jilintai Hydropower Development Co., Ltd. China 27 Aug 2010
Grid Connected Bundled Wind Power Project in Jaisalmer, Rajasthan, India Diamonds ‘R’ Us India 27 Aug 2010
Hubei Macheng Rural Solar Cooker Utilization Project Shanghai Techase Environment Protection Technology Co., LTD China 27 Aug 2010
Gansu Dunhuang Energy saving modification Project from surplus heat utilization of sodium sulfide furnace of Xiyu mining chemical industry Xiyu mining chemical industry Co., LTD in Dunhuang City, Gansu Province China 27 Aug 2010
Inner Mongolia Linxi Dashuiboluo Wind Farm Phase I Project Linxi Aolujia New Energy Development Co., Ltd. China 27 Aug 2010
Mindanao Grains Bundled Biomass-Fired Corn Dryers in Two (2) Post Harvest Facilities in Bukidnon, Philippines Mindanao Grain Processing Co. Inc. Philippines 27 Aug 2010
40 MW Sugarcane Bagasse Cogeneration Project - UTE Baia Formosa CPFL Bioformosa Brazil 27 Aug 2010
3 MW Wind Power CDM Project by Shajahans Jewellers, Nagercoil, Tamil Nadu, India Shajahans Jewellers India 27 Aug 2010
2.5 Mw power generation through installation of wind turbine generators in Tamil Nadu, India M/s Fort Projects Pvt Ltd India 27 Aug 2010
Ningxia Taiyangshan Wind Farm Jingneng First Phase 49.5 MW Project Ningxia Jingneng New Energy Co., Ltd. China 27 Aug 2010
Xinjiang Kashi River Salikete Hydropower Project Guodian Xinjiang Jilintai Hydropower Development Co., Ltd. China 27 Aug 2010
Huaneng Laizhou Phase II Wind Farm Project Huaneng Shandong Power Generation Co., Ltd. China 27 Aug 2010
Xinjiang Kashi River Nileke First Stage Hydropower Project Guodian Xinjiang Jilintai Hydropower Development Co., Ltd. China 27 Aug 2010
Rice husk based energy generation in Haryana by REI Agro Ltd. REI Agro Ltd. India 26 Aug 2010
Distribution of Improved cook stove – Phase II G K Energy Marketers Pvt Ltd India 26 Aug 2010
Distribution of Improved cook stove – Phase I G K Energy Marketers Pvt Ltd India 26 Aug 2010
Greenhous Gas Emission Reductions Through Natural Gas - Samalkot Power Ltd. Samalkot Power Ltd. India 26 Aug 2010
Biomass based captive cogeneration generation project by Punjab Riceland Pvt. Ltd. Punjab Rice Land Pvt. Ltd. India 26 Aug 2010
Biomass based steam generation project by Tau Agro Sales Pvt. Ltd. Tau Agro Sales Pvt. Ltd. India 26 Aug 2010