Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 427 | 428 | 429 | 430 | 431 | ... 669 >>
Displaying 8561-8580 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Akhfennir Wind Farm Project - Morocco. NAREVA Holding Morocco 16 Sep 2010
Haouma Wind Farm Project - Morocco. NAREVA Holding Morocco 16 Sep 2010
Community-based Reforestation on Degraded Lands in East Lombok Forestry Research and Development Agency Indonesia 16 Sep 2010
Thac Xang Hydro-power project CARBONIUM Viet Nam 16 Sep 2010
Kangbao Zhaoyanghe Wind Farm Project Guodian Tianwei Kangbao Wind Power Co. Ltd. China 16 Sep 2010
Inner Mongolia Sansheng 49.5 MW Wind Farm Project Phase I Xining Aiyuan Landfill Gas Co., Ltd. China 16 Sep 2010
Foum El Oued Wind Farm Project - Morocco. NAREVA Holding Morocco 16 Sep 2010
Jilin Taonan Xinli 49.5 MW Wind Power Project Jilin Tong Li Wind Farm Power Co., Ltd. China 16 Sep 2010
Agro fuels based Boiler for Power Generation at Salem Steel Plant Steel Authority of India Limited, India India 15 Sep 2010
1.25 MW biomass gasification based power generation at Bhopal District of Madhya Pradesh by Anant Urja Private Limited Anant Urja Private Limited India 15 Sep 2010
Regenerative Burners for Melting Furnaces Dubai Aluminum Company LTD (DUBAL) United Arab Emirates 15 Sep 2010
ROHIT SURFACTANTS PVT.LTD- 10.5 MW Wind Project, Tamil Nadu M/s. Rohit Surfactants Pvt. Limited India 15 Sep 2010
6 MW biomass based cogeneration plant at Virudhunagar District of Tamil Nadu by Sripathi Paper and Boards Private Limited Sripathi Paper and Boards Private Limited India 15 Sep 2010
Energy efficient shaft kilns at new Refractory Material Plant #3 of Bhilai Steel Plant Steel of Authority of India Limited, India India 15 Sep 2010
Dingbian Zhangjiashan Wind Farm Phase I Project Datang Shaanxi Power Generation Co., Ltd., P.R.C. China 15 Sep 2010
Samsung Electronics Development of PFCs Emission Abatement Facility in the Semiconductor Process Samsung Electronics Co., Ltd. Republic of Korea 15 Sep 2010
Biogas Power Generation Project in Longganhu Town, Huanggang city, Hubei Province, P.R. China Hubei Huadian Longganhu Biogas Power Generation co., Ltd China 15 Sep 2010
Caetité 2 Wind Power Plant CDM Project Activity. Neoenergia S.A. Brazil 14 Sep 2010
0.8 MW Wind Power CDM Project of Mr. Rahul Dravid, Rajasthan Mr. Rahul Dravid India 14 Sep 2010
Caetité 1 Wind Power Plant CDM Project Activity. Neoenergia S.A. Brazil 14 Sep 2010