Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 421 | 422 | 423 | 424 | 425 | ... 669 >>
Displaying 8441-8460 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Algarrobo Wind Farm Polesine S.A Uruguay 01 Oct 2010
Balargha Small Hydro Electric Power Project of Sandhya Hydro Power Projects Balargha Private Limited, Himachal Pradesh, India Sandhya Hydro Power Projects Balargha Private Limited India 01 Oct 2010
0.25 Mw wind project in Satara, Maharashtra MS Regal Computer Systems Pvt. Ltd. India 01 Oct 2010
Rubberflex Biogas Plant, Pahang Rubberflex ReEnergy Sdn. Bhd. Malaysia 01 Oct 2010
Fuente Wind Farm Polesine S.A Uruguay 01 Oct 2010
1.6 MW Wind Power CDM Project by Mahalakshmi Infraprojects Ltd., Maharashtra, India Mahalakshmi Infraprojects Ltd. India 01 Oct 2010
Florida Wind Farm Polesine S.A Uruguay 01 Oct 2010
Dan Chang Bio-Energy Cogeneration Expansion Project Dan Chang Bio-Energy Thailand 30 Sep 2010
2*1.25 MW Wind Power CDM Project by Rajasthan Gum Ltd., At Karnataka, India Rajasthan Gum Limited India 30 Sep 2010
Promotion of the Improved Cooking Stove (ICS) - Nepal Alternative Energy Promotion Centre Nepal 30 Sep 2010
Promotion of the Improved Water Mills (IWM) - Nepal Alternative Energy Promotion Centre Nepal 30 Sep 2010
1.25 Mw Wind Project By Lincon Polymers Private Limited M/s. Lincon Polymers Private Limited India 30 Sep 2010
Modular Power 0.6 MW Wind Project 2010 Rajasthan M/s. Modular Power (P) Ltd. India 30 Sep 2010
Promotion of the Solar Home Systems (SHS) - Nepal Alternative Energy Promotion Centre Nepal 30 Sep 2010
Henan Suixian Longyuan Steam Optimizing Project Suixian Longyuan Paper limited Co., Ltd (China) China 29 Sep 2010
3 MW Haripur Nallah Small Hydro Project by Continental Intra-Tech Pvt. Ltd. Continental Intra-Tech Pvt. Ltd. India 29 Sep 2010
Hengam Field Gas Treatment Plant and Infrastructure Project Carbon Limits AS Iran (Islamic Republic of) 29 Sep 2010
Nanchong MSW Incineration Power Generation Plant AIVC Nanchong Renewable Energy Co., Ltd. China 29 Sep 2010
Sunstone Development Co., Ltd. 4.5 MW Waste Heat Recovery for Power Generation Project Sunstone Development Co., Ltd. (P. R. China) China 29 Sep 2010
Sichuan Desheng Group Cement Co., Ltd. 9 MW Waste Heat Recovery for Power Generation Project Sichuan Desheng Group Cement Co., Ltd. China 29 Sep 2010