Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 402 | 403 | 404 | 405 | 406 | ... 669 >>
Displaying 8061-8080 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Cerro del Águila Kallpa Generación S.A. Peru 15 Nov 2010
Electricity generation using windmill in Tamil Nadu by Ram Conductors and Transformer P Ltd - -Bundled project by Sreyas Corporate Concepts Private Limited M/s. RAM CONDUCTORS AND TRANSFORMER PVT LTD India 15 Nov 2010
Sichuan Lisen Agaric Fungi Residue. Substitution of Coal as Fuel for Cement Production Sichuan Building Material Group Ltd. China 15 Nov 2010
Absa Towers West Energy Centre Project CDM Africa Climate Solutions (Pty) Ltd South Africa 15 Nov 2010
Extension and Technical transformation of Zhongfang Sanjiaotan Hydropower Station Project Huaihua City Yulong Hydropower Development Co., Ltd China 15 Nov 2010
Wind Power Project at Kutch by Powerica Limited Powerica Limited India 15 Nov 2010
REHABILITATION OF THE MPIANA MWANGA HYDROPOWER STATION Hydro Power Congo (HPC) sprl Democratic Republic of the Congo 15 Nov 2010
Biogas utilization CDM project based on anaerobic digestion of organic material Daegu Metropolitan City Republic of Korea 15 Nov 2010
Jiangsu Taizhou biomass cogeneration Project Jiangsu Luen Mei Bio-energy Company Limited. China 15 Nov 2010
Hebei Zhangbei Lijiaying Wind Farm Project Carbon Resource Management S.A. China 15 Nov 2010
Biomass based Thermal Energy Generation at Patanjali Natural Coloroma (P) Limited Patanjali Natural Coloroma (P) Limited India 15 Nov 2010
0.750 MW Wind Power Project activity by Surana Ventures Limited Surana Ventures Limited India 15 Nov 2010
Huaneng Shandong Hekou Phase IV Wind Farm Project Carbon Resource Management S.A. China 15 Nov 2010
0.8 MW Wind Power CDM Project by Powerlink System Pvt. Ltd, Tamilnadu, India Powerlink System Pvt. Ltd. India 15 Nov 2010
Solar Power Project by SunBorne Energy Gujarat One Private Limited SunBorne Energy Gujarat One Private Limited India 15 Nov 2010
0.8MW Wind Power CDM Project by Texonic Instruments TEXONIC INSTRUMENTS India 15 Nov 2010
0.8 MW Wind Power CDM Project by Sri Saradhambika Spintex (P) Ltd, Coimbatore, Tamil Nadu, India Sri Saradhambika Spintex (P) Ltd. India 15 Nov 2010
15MW Captive Power Plant of Shree Ram Electrocast Pvt. Ltd. (Karnataka), using Partly Waste Gases, Partly Biomass & Partly Coal as a fuel. SHREE RAM ELECTROCAST PVT. LTD. India 15 Nov 2010
.600 MW Wind Power Project in Tamilnadu G.R.THANGAMALIGAI & SONS India 14 Nov 2010
1.500 MW Wind Power Project in Tamilnadu G.R.THANGAMALIGAI (FIRM) India 14 Nov 2010