04:23 18 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
721-740
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Sea Water Air-conditioning(SWAC) Project in Mauritius | URBAN COOLING LTD | Mauritius | 24 Oct 2017 |
200 MW Wind Power Project in Tamil Nadu by Orange Sironj | Orange Sironj Wind Power Pvt. Ltd. | India | 24 Oct 2017 |
1x20MW Gubbi Solar PV Power Project by M/s Adani Green Energy (UP) Limited at Ankasandra, Tumkuru, Karnataka | ADANI GREEN ENERGY UP LTD | India | 18 Oct 2017 |
1 x50MW Rajeswar Solar PV Power Project by M/s Wardha Solar (Maharashtra) Private Limited at Rajeshwar, Bidar, Karnataka | Wardha Solar (Maharashtra) Private Limited | India | 18 Oct 2017 |
2x10 MW Kanasar Solar PV Power Project by M/s Prayatna Developers Pvt. Ltd. at Kanasar, Jodhpur, Rajasthan | PRAYATNA DEVELOPERS PRIVATE LIMITED | India | 18 Oct 2017 |
1 x20MW Holenarsipura Solar PV Power Project by M/s Adani Green Energy (UP) Limited at Chikkannahalli, Hasan, Karnataka | ADANI GREEN ENERGY UP LTD | India | 18 Oct 2017 |
1 x20MW Periyapattna Solar PV Power Project by M/s Adani Green Energy (UP) Limited at Ravandur, Mysuru, Karnataka | ADANI GREEN ENERGY UP LTD | India | 18 Oct 2017 |
1x20MW Maaluru Solar PV Power Project by M/s Adani Green Energy (UP) Limited at Thirthabandhahatti, Kolar, Karnataka | ADANI GREEN ENERGY UP LTD | India | 18 Oct 2017 |
1x20MW Jevargi Solar PV Power Project by M/s Adani Green Energy (UP) Limited at Hippargi, Kalburgi, Karnataka | ADANI GREEN ENERGY UP LTD | India | 18 Oct 2017 |
1x20MW T Narsipura Solar PV Power Project by M/s Adani Green Energy (UP) Limited at Bettaahalli, Mysuru, Karnataka | ADANI GREEN ENERGY UP LTD | India | 18 Oct 2017 |
1x10MW Shorapur Solar PV Power Project by M/s Parampujya Solar Energy Pvt Ltd at Shorapur, Yadgir, Karnataka | Parampujya Solar Energy Pvt Ltd | India | 18 Oct 2017 |
2x50 MW Solar PV Power Project by M/s Parampujya Solar Energy Pvt. Ltd. at Rajpur. Gadadih and Hathidob. district- Durg and Bemetara, Chhattisgarh. | PARAMPUJYA SOLAR ENERGY PRIVATE LIMITED | India | 18 Oct 2017 |
1x20MW Bayadgi Solar PV Power Project by M/s Adani Green Energy (UP) Limited at Bayadgi, Haveri, Karnataka | Adani Green Energy (UP) Ltd | India | 18 Oct 2017 |
AfriSam ULCO Waste Heat Recovery | AfriSam (South Africa) (Pty)Ltd | South Africa | 17 Oct 2017 |
5.566 MW Solar Power Project at Andhra Pradesh by Raajratna Energy Holdings Pvt. Ltd | Infinite Solutions | India | 14 Oct 2017 |
Bundled Solar Power Project in India by Baidyanath Group of Companies | EKI Energy Services Limited | India | 13 Oct 2017 |
Program of activities of Small hydropower plant projects from Atiaia Energia | Atiaia Energia S.A. | Brazil | 03 Oct 2017 |
Areado Small Hydro Power Plant CDM Project Activity | AREADO ENERGIA SA | Brazil | 03 Oct 2017 |
72 MWac Ramnad Solar Power Project | Infinite Solutions | India | 28 Sep 2017 |
72 MWac Kamuthi Renewable Energy Poject | Infinite Solutions | India | 28 Sep 2017 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: