12:17 19 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
1341-1360
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
2MW wind power generation by ISIPL | Interocean Shipping (I) Pvt. Ltd. | India | 29 Apr 2015 |
GHG Emissions reduction through Modjo CETP | Leather Industry Development Institute (LIDI) | Ethiopia | 24 Apr 2015 |
Energy for Sustainable Development in the Caribbean Buildings (PoA) | Caribbean Community Climate Change Centre (CCCCC) | Antigua and Barbuda Belize Grenada Saint Lucia Saint Vincent and the Grenadines |
22 Apr 2015 |
Grid connected renewable electricity through the SHP Pinheirinho | NB Geração de Energia Ltda | Brazil | 20 Apr 2015 |
51 MW Solar Power Project at Charanka, Gujarat | Torrent Solargen Limited | India | 18 Apr 2015 |
Bundled renewable power project by EKI ESL–2015-20 | EKI Energy Services Limited | India | 16 Apr 2015 |
Biomass based Thermal Energy Generation at J.N.P. Products, Bharuch, India | J.N.P. Products | India | 16 Apr 2015 |
Aggregate 540 kWp Grid Connected Rooftop Solar Photovoltaic based Solar Power Plants at Various Twelve Locations of Surat Municipal Corporation within Surat city in Surat district of Gujarat State, India | Surat Municipal Corporation | India | 15 Apr 2015 |
Bundled renewable power project by Gujarat Guardian Ltd (EKI ESL 02-2015-13.2) | Gujarat Guardian Limited | India | 13 Apr 2015 |
Bundled renewable power project by EKI ESL–2015-19 | EKI Energy Services Limited | India | 11 Apr 2015 |
Bundled renewable power project by EKI ESL 2015- 01 | EKI Energy Services Limited | India | 08 Apr 2015 |
Emission reduction from Sewage Treatment Plant | Bangalore Water Supply and Sewerage Board | India | 07 Apr 2015 |
Bundled renewable power project by EKI ESL–2015-18 | EKI Energy Services Limited | India | 04 Apr 2015 |
Hiriyur Solar PV power plant, Karnataka | M/s Bhoruka Power Corporation Limited | India | 03 Apr 2015 |
10 MW solar power project at Chitradurga District, Karnataka | Clean Solar Power (Hiriyur) Private Limited | India | 31 Mar 2015 |
Mulilo Sonnedix Prieska PV | Mulilo Sonnedix Prieska PV (Pty) Ltd. | South Africa | 30 Mar 2015 |
Mulilo Prieska PV | Mulilo Prieska PV (Pty) Ltd. | South Africa | 30 Mar 2015 |
Waste Heat Recovery based power generation at UCWL | Udaipur Cement Works Limited | India | 30 Mar 2015 |
Yelisirur wind power project (phase 2) | M/s Bhoruka Power Corporation Limited | India | 27 Mar 2015 |
EMPOWER District Cooling Projects | Emirates Central Cooling Systems Corporation (Empower) | United Arab Emirates | 26 Mar 2015 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: