Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 643 | 644 | 645 | 646 | 647 | ... 669 >>
Displaying 12881-12900 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Bundled Wind Power Project by Ms. D. J. Malpani M/s. D. J. Malpani India 23 Mar 2009
Integrated biomass Power project at Perundurai, Erode district, Tamil Nadu, India All Green Energy India 23 Mar 2009
Rice Husk based Co-generation Power Project at Usher Eco Power Limited, Chhata, Uttar Pradesh, India Usher Eco Power Lt India 21 Mar 2009
Wind Power Project at Sinner Maharashtra S.K. Shivaraj (individual) India 21 Mar 2009
23 MW biomass based cogeneration project in Tamilnadu M/s Dhanalakshmi Srinivasan Sugars Pvt. Ltd. India 21 Mar 2009
Wind power project at Sinner Maharashtra S.K. Shivaraj India 21 Mar 2009
Methane Emissions Avoidance in Armenia Gas Distribution Network ArmRusgasprom CJSC Armenia 20 Mar 2009
Electrification and Mechanical Efficiency of Mills House in Pakistan Shahmurad Sugar Mills Ltd. Pakistan 20 Mar 2009
High emissivity Ceramic Coating in Furnaces for reducing fuel consumption” in Bharat Petroleum Corporation Limited, India Bharat Petroleum Corporation Limited India 20 Mar 2009
Bagmane World Trade Center GM-Projects India 20 Mar 2009
Construction of hydro power plant on Golen Gol Nullah First Climate Switzerland AG Pakistan 19 Mar 2009
Shaanxi 2×30MW Biomass Power Generation Project ShanghaiBluebirdmeEnvironmentalTechnology China 19 Mar 2009
Pequena Central Hidreletrica Niagara Project Activity EcoPart Brazil 19 Mar 2009
Integrated biomass power project at Perundurai, Erode district, Tamil Nadu, India Perundurai Green Energy Pvt. Lt India 19 Mar 2009
Pequena Central Hidreletrica Rio Manso Project Activity EcoPart Brazil 19 Mar 2009
Pequena Central Hidreletrica Santana Project Activity EcoPart Brazil 19 Mar 2009
Pequena Central Hidreletrica Figueira Branca Project Activity EcoPart Brazil 19 Mar 2009
Pequena Central Hidreletrica Fazenda do Salto Project Activity EcoPart Brazil 19 Mar 2009
1.25 MW Suzlon make, Model S66, WTG at Site Location S 706 TECHNO RINGS India 18 Mar 2009
Integrated waste management in Western Provice, Sri Lanka Chandani Panditharatne Sri Lanka 18 Mar 2009