02:25 18 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
12701-12720
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Water re-circulation project by Jain Irrigation Systems | Jain Irrigation Systems Ltd. Jalgoan | India | 24 Apr 2009 |
Biogas based co-generation project in Maharashtra by Jain Irrigation Systems | Jain Irrigation Systems Ltd. Jalgoan | India | 24 Apr 2009 |
Micro Irrigation System | Jain Irrigation Systems Ltd | India | 24 Apr 2009 |
Micro irrigation system by Jain Irrigation Systems | Jain Irrigation Systems Ltd. Jalgoan | India | 24 Apr 2009 |
Unidade de Bioenergia Paranaiba I | Companhia Brasileira de Energia Renovável | Brazil | 23 Apr 2009 |
Unidade de Bioenergia Costa Rica | Companhia Brasileira de Energia Renovável | Brazil | 23 Apr 2009 |
Unidade de Bioenergia Perolandia | Companhia Brasileira de Energia Renovável | Brazil | 23 Apr 2009 |
Unidade de Bioenergia Morro Vermelho | Brenco Companhia Brasileira de Energia Renovavel | Brazil | 23 Apr 2009 |
Unidade de Bioenergia Paranaiba II | Companhia Brasileira de Energia Renovável | Brazil | 23 Apr 2009 |
Unidade de Bioenergia Agua Ememdada | Companhia Brasileira de Energia Renovável | Brazil | 23 Apr 2009 |
Unidade de Bioenergia Alto Taquari | Brenco Companhia Brasileira de Energia Renovavel | Brazil | 23 Apr 2009 |
Wind based power project at Jakhau | GSPC Gujarate State Petroleum Corporation Ltd. | India | 22 Apr 2009 |
2 wind parks called NONGBORN and MAP YOD | Relab Energy | The former Yugoslav Republic of Macedonia | 22 Apr 2009 |
23 MW Waste gas heat based power project at Lohop and Talvali Villages of Patalagamga in Maharashtra, India | Aditya Birla Nuvo Ltd., | India | 22 Apr 2009 |
Tejar Santa Teresa S.A. project - Cúcuta, Colombia | Tejar Santa Teresa S.A. | Colombia | 22 Apr 2009 |
8 MW Biomass power project in Revuru Village Mellacheruvu mandal | MATA ENERGY LIMITED | India | 22 Apr 2009 |
‘MAP YOD’ park Wind power project in Thailand | relab energy co ltd | Thailand | 21 Apr 2009 |
Shandong Province Jinjiang Biodiesel Production Project | Shangdong Jinjiang Environment & Energy Thermal power Co., Ltd | China | 21 Apr 2009 |
PROYECTO EC[1].ERMPRENDEDORES | Ecuatorianos Emprendedores | Ecuador | 21 Apr 2009 |
Indoethanol Lampung Methane Emission Utilization for Power Generation from Ethanol Waste Water Treatment | Sindicatum Carbon Capital Limited | Indonesia | 21 Apr 2009 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: