02:11 21 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
11261-11280
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Clinker optimization in cement types production at Ethio Cement cement plant | Ethio Cement Plc; Ethan Bio-Fuels Plc | Ethiopia | 24 Nov 2009 |
Saguan Wongse Energy Cassava Wet Fiber to Energy Project | Saguan Wongse Energy Co., Ltd. | Thailand | 24 Nov 2009 |
Guodian Ningxia Zhongwei 10MWp Solar Photovoltaic Power Project | Ningxia Guodian A’tesi New Energy Development Co., Ltd | China | 24 Nov 2009 |
SEEE Baoan (Laohukeng) Second Phase MSW Power Generation Project | Shenzhen Energy Environmental Engineering Co., Ltd | China | 24 Nov 2009 |
Hidroelectrica Las Perlas Sur | Las Perlas Sur, S.A. | Panama | 24 Nov 2009 |
Hidroelectrica Las Perlas Norte | Las Perlas Norte, S.A. | Panama | 24 Nov 2009 |
Inner Mongolia Tongliao Naiman Banner Baxiantong Chagantala Wind Power Project | Longyuan (Naiman) Wind Power Co. Limited | China | 24 Nov 2009 |
GuoDian Ningxia Pingluo 10MWp Solar Photovoltaic Power Project. | Ningxia Guodian A’tesi New Energy Development Co., Ltd. | China | 24 Nov 2009 |
Gansu Hekou Hydropower Project | Gansu Diantou Hydropower Development Co., Ltd. | China | 24 Nov 2009 |
Waste Gas Recovery and Utilization in the Manganese-Silicon Alloy Production Lines Project | MINMETALS (HUNAN) FERROALLOYS CO., LTD | China | 24 Nov 2009 |
Shandong Feixian 9MW cement waste heat recovery project | Feixian Yizhou Cement Co. Ltd. | China | 23 Nov 2009 |
Joburg Landfill Gas To Energy Project | EcoSecurities International Limited | South Africa | 23 Nov 2009 |
Yunnan Luopingshan Phase I Wind Power Project | Datang Eryuan Wind Power Co., Ltd | China | 23 Nov 2009 |
Lianyua Lida Coal Mine Methane Utilization Project | Hunan Lida Energy development Co., Ltd | China | 23 Nov 2009 |
Yuzhou Jinxin Cement WHR Project | Yuzhou Letter Cement Co., Ltd Kam | China | 23 Nov 2009 |
Hunan Yuanling Yixi River Hydropower project | Yuanling Yixi River Hydropower Developing Co., Ltd | China | 23 Nov 2009 |
Shandong Yizhou 4.5MW cement waste heat recovery project | Shandong Linyi Yizhou Cement Co. Ltd. | China | 23 Nov 2009 |
Integrated Waste Management Project at Jeddah, Kingdom of Saudi Arabia | Zero Waste Holding W.L.L | India | 23 Nov 2009 |
R.S.J. OZONE BUNDLED WIND FARM CDM PROJECT | M/s Quality Knit Wears Private Limited | India | 23 Nov 2009 |
MBL Stage-3 Hydro Electric Project in Punjab | Gill Acqua Hydro Power Generation Company Limited | India | 23 Nov 2009 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: