Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 558 | 559 | 560 | 561 | 562 | ... 669 >>
Displaying 11181-11200 of 13375 notifications.
Project Title Entity Name Host Party Date Received
0.80 MW Wind Power CDM Project by Sabarmati Construction Company Sabarmati Construction Company India 30 Nov 2009
Verdes Mares Wind Power Project Zephyr Geracao e Comercialzacao de Energia Ltda Brazil 30 Nov 2009
Municipal Solid Waste (MSW) processing and power generation in Kota, Rajasthan Hydroair Tectonics (PCD) Ltd India 30 Nov 2009
Municipal Solida Waste (MSW) processing and power generation in Pallavapuram Hydroair Tectonics (PCD) Ltd India 30 Nov 2009
Emery Oleochemicals Waste Water Treatment Plant Emery Oleochemicals (M) Sdn Bhd Malaysia 30 Nov 2009
1.25 MW Wind Power CDM Project by Royal Imprex Royal Imprex (India) India 30 Nov 2009
Municipal Solid Waste (MSW processing and power generation in Barmer, Rajasthan Hydroair Tectonics (PCD) Ltd India 30 Nov 2009
Estacao Indaial SHP CDM Project Carbotrader Assessoria e Consultoria cm Energia Ltda Brazil 30 Nov 2009
Waste heat recovery and captive power generation at Raigarh Ispat and Power Ltd., Chhatisgarh. Raigarh Ispat and Power Ltd. India 30 Nov 2009
Waste Heat Recovery for Power Generation in Lengshuijian Steel and Iron Co. Ltd.. Lengshuijian Steel & Iron Co. Ltd.. China 30 Nov 2009
BFG Recovery as Fuel of Heating Furnaces Reconstruction in Lengshuijian Steel and Iron Co., Ltd. Lengshuijian Steel & Iron Co., Ltd. China 30 Nov 2009
Fuqing Zeqi Wind Farm Project Zhongmin(Fuqing) Wind Power Ltd. China 30 Nov 2009
Estação Indaial SHP CDM Project (JUN1131) Carbotrader Assessoria e Consultoria em Energia Ltda. Brazil 30 Nov 2009
Bundle of activities to avoid methane production from municipal waste landfills through waste composting plants in Inírida, Mitú, San José del Guaviare and Calamar in Colombia Corporacion para el Desarrollo Sostenible del Norte y Oriente Amazonico - CDA Colombia 30 Nov 2009
Project of Fossil Fuel Switch to Biomass Residues in Boilers for Heat Generation in Liuyang Liuyang New Century Environment and Development Co., Ltd. China 30 Nov 2009
Tapera Wind Power Project Zephyr Geracao e Comercialzacao de Energia Ltda Brazil 30 Nov 2009
Lianghekou Hydropower Project Shennongjia Xinxing Hydro Power Co. Ltd. China 30 Nov 2009
Raojiahe Hydropower Project Shennongjia Xinxing Hydro Power Co. Ltd. China 30 Nov 2009
Trimula Industries WHR project Trimula Industries Pvt. Ltd. India 29 Nov 2009
1.25 MW Wind Power Project by Royal Impex (India) Royal Impex (India) India 28 Nov 2009