Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 508 | 509 | 510 | 511 | 512 | ... 669 >>
Displaying 10181-10200 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Ping Zhai Hydropower station Guizhou Province Qianzhong Hydro Project Construction Authority China 19 Mar 2010
El Camalote 8 MW Hydroelectric Project Enrique Alberto De la Roca Coronado Guatemala 19 Mar 2010
Replace natural gas with renewable light gas as a feedstock at hydrogen plant Neste Oil Singapore PTE Ltd Singapore 18 Mar 2010
Utilization Calcium Carbide Slag for Clinker Production in Yibin Haifeng Herui Cement Project Yibin Haifeng Herui Co., Ltd China 18 Mar 2010
Fuxin Coal Mine Methane Utilization Project Carbon Resource Management S.A. China 18 Mar 2010
1.25 MW Wind Power CDM Project by Siddharth Properties, Pune - Maharashtra, India Siddharth Properties India 18 Mar 2010
Electricity generation using windmill in Tamil Nadu by Kikani Exports Pvt Ltd-1250 kW - Bundled project by Sreyas Corporate Concepts Private Limited M/s Kikani Exports Private Limited India 18 Mar 2010
Song Giang 1 Hydro Power Project Song Giang Hydropower Joint Stock Company Viet Nam 18 Mar 2010
“Korea South-East Power Co. Yeongheung Wind Farm Project(20MW)” Korea South East Power Co., Ltd. Republic of Korea 18 Mar 2010
Green Energy Generation by Pravara Renewable Energy Limited Pravara Renewable Energy Limited India 18 Mar 2010
Biomass based Co-generation Project by Daulat Rice & General Mill Daulat Rice & General Mill India 18 Mar 2010
Rajendra Exim Pvt Ltd. Rajendra Exim Pvt Ltd. India 18 Mar 2010
Lower Arun Hydroelectric Project Lower Arun Hydroelectric Private Limited Nepal 18 Mar 2010
“Korea South-East Power Co. 3MW bundled Photovoltaic power plants project” Korea South East Power Co., Ltd. Republic of Korea 18 Mar 2010
Nuevo Pemex cogeneration project Petroleos Mexicanos Mexico 17 Mar 2010
Bundle Wind Power Project- EnKing International (CDM.Feb-10-02) M/s Galaxy Transmissions Pvt. Ltd. India 17 Mar 2010
0.8MW Wind Power Project at Gujarat Amakan Overseas(P) Limited India 17 Mar 2010
Small scale methane recovery and biogas utilization project by Gayatri Dairy Products Pvt. Ltd. GAYATRI DAIRY PRODUCTS PVT. LTD. India 17 Mar 2010
Himaxen/Hudigm bundled Photovoltaic Power Plant Project Hudigm Republic of Korea 17 Mar 2010
Bundle Wind Power Project- EnKing International (CDM.Feb-10-02) M/s Abundance Equipment Pvt. Ltd. India 17 Mar 2010