Project: 3193 Wayang Windu Phase 2 Geothermal Power Project - Crediting Period Renewal Request
[]
Project 3193: Wayang Windu Phase 2 Geothermal Power Project

- project design document (4183 KB)

PDD appendices
Appendix 1 - CER sheet star energy 12022019 (2027 KB)

- crediting period renewal form (295 KB)
Methodologies Used ACM0002 ver. 19 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 698,448 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (1258 KB)
Renewal Date (Renewable) Rejected   (view history)   completeness check: complete info & rep check: concluded
Crediting Period (requested for renewal) 02 Dec 17 - 01 Dec 24

Other crediting period(s): 02 Dec 10 - 01 Dec 17 02 Dec 17 - 01 Dec 24