Project 6364 : Ningxia Hongsibao Windfarm Jiaze Qingshan 49.5MW Wind Power Project
Project title Ningxia Hongsibao Windfarm Jiaze Qingshan 49.5MW Wind Power Project
- project design document (675 KB)

PDD appendices
Appendix 1 - 6364 IRR Calculation (146 KB)
Appendix 2 - 6364 CER Calculation (64 KB)


- registration request form (21 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (841 KB) authorization (841 KB)
Authorized Participants: Ningxia Jiaze Power Generation Co., Ltd.
Other Parties Involved Switzerland , involved indirectly approval (24 KB) authorization (24 KB)
Authorized Participants: Vitol S.A.
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 12 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 85,455 metric tonnes CO2 equivalent per annum
Fee level USD 15591.0
Validation Report VVS/VVM version: VVM 1.2
Validation report (1529 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 03/09/2012
Registration Date 11 Jun 12 (Date of registration action 31 Aug 12)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Apr 13 - 31 Mar 20 (Renewable - Expired)
Changed from: 01 Jan 14 - 31 Dec 20
Renewal no longer possible
Requests for Issuance
and related documentation