Project: 6062 Jiangxi Yudu Yuezhou Hydropower Project - Crediting Period Renewal Request
[]
Project 6062: Jiangxi Yudu Yuezhou Hydropower Project

- project design document (1472 KB)

PDD appendices
Appendix 1 - Jiangxi Yudu Yuezhou Hydropower Project (6062)-ER sheet v05 (26 KB)

- crediting period renewal form (366 KB)
Methodologies Used ACM0002 ver. 19 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 59,726 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (795 KB)
Renewal Date 12 Feb 20 (Renewable)   (view history)   info & rep check: concluded
Crediting Period (requested for renewal) 01 May 19 - 30 Apr 26

Other crediting period(s): 01 May 12 - 30 Apr 19
Requests for Issuance
and related documentation