17:22 27 Apr 24
Project
5972 :
Jiangxi Leping Mining Administration Low Concentration CMM Utilization Project
Project title |
Jiangxi Leping Mining Administration Low Concentration CMM Utilization Project
- project design document (973 KB) PDD appendices Appendix 1 - ER sheet (25 KB) Appendix 2 - IRR sheet (103 KB) Appendix 3 - IRR sheet-after deduction of VAT (104 KB) - registration request form (143 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
China
, involved indirectly
approval (537 KB)
authorization (537 KB)
Authorized Participants: Leping Mining Administration |
Other Parties Involved |
Switzerland
, involved indirectly
approval (277 KB)
authorization (277 KB)
Authorized Participants: Bunge Emissions Holdings Sarl |
Sectoral scopes |
8 : Mining/mineral production
10 : Fugitive emissions from fuels (solid, oil and gas) |
Activity Scale | LARGE |
Methodologies Used |
ACM0008 ver. 7 -
Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation
|
Standardized baselines used | N/A |
Amount of Reductions | 131,967 metric tonnes CO2 equivalent per annum |
Fee level | USD 24893.4 |
Validation Report |
Validation report (592 KB)
Public availability information
Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 15/06/2012 |
Registration Date | 05 Apr 12 (Date of registration action 14 Jun 12) (view history) completeness check: complete info & rep check: concluded |
Crediting Period | 05 Apr 12 - 04 Apr 22 (Fixed) |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: