Project 5972 : Jiangxi Leping Mining Administration Low Concentration CMM Utilization Project
Project title Jiangxi Leping Mining Administration Low Concentration CMM Utilization Project
- project design document (973 KB)

PDD appendices
Appendix 1 - ER sheet (25 KB)
Appendix 2 - IRR sheet (103 KB)
Appendix 3 - IRR sheet-after deduction of VAT (104 KB)


- registration request form (143 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (537 KB) authorization (537 KB)
Authorized Participants: Leping Mining Administration
Other Parties Involved Switzerland , involved indirectly approval (277 KB) authorization (277 KB)
Authorized Participants: Bunge Emissions Holdings Sarl
Sectoral scopes 8 : Mining/mineral production
10 : Fugitive emissions from fuels (solid, oil and gas)
Activity Scale LARGE
Methodologies Used ACM0008 ver. 7 - Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation
Standardized baselines used N/A
Amount of Reductions 131,967 metric tonnes CO2 equivalent per annum
Fee level USD 24893.4
Validation Report Validation report (592 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 15/06/2012
Registration Date 05 Apr 12 (Date of registration action 14 Jun 12)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 05 Apr 12 - 04 Apr 22 (Fixed)
Requests for Issuance
and related documentation