Project 5830 : Jilin Tumen Mopanshan 16 MW Hydro Power Project
Project title Jilin Tumen Mopanshan 16 MW Hydro Power Project
- project design document (847 KB)

PDD appendices
Appendix 1 - Starting Date_Jilin Tumen (1028 KB)
Appendix 2 - Prior CDM Consideration_Jilin Tumen (1011 KB)
Appendix 3 - ER Calculation_Jilin Tumen (69 KB)
Appendix 4 - Investment Analysis_Jilin Tumen (91 KB)


- registration request form (621 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (282 KB) authorization (282 KB)
Authorized Participants: GD Power Mopanshan Branch Company
Other Parties Involved United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (82 KB) authorization (82 KB)
Authorized Participants: Standard Bank Plc (withdrawn as of 11/05/2020)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 12 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 50,137 metric tonnes CO2 equivalent per annum
Fee level USD 8527.4
Validation Report Validation report (544 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 17/07/2012
MoC Annex 3 (Withdraw Focal Point) valid as of 20/07/2020
MoC Annex 2 (Withdraw Project Participant (Voluntary)) valid as of 11/05/2020
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 26/04/2013
Registration Date 26 Apr 12 (Date of registration action 13 Jul 12)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 26 Apr 12 - 25 Apr 19 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation