Project 3687 : Sichuan Shuanghekou 18MW Hydropower Project
Project title Sichuan Shuanghekou 18MW Hydropower Project
- project design document (454 KB)

PDD appendices
Appendix 1 - CDM consideration, Shuanghekou (3251 KB)
Appendix 2 - Common practice, Shuanghekou (287 KB)
Appendix 3 - ER calculation, Shuanghekou (76 KB)
Appendix 4 - IRR calculation, Shuanghekou (102 KB)
Appendix 5 - IRR evidence, Shuanghekou (1166 KB)
Appendix 6 - Starting date, Shuanghekou (250 KB)
Appendix 7 - Voluntary withdrawal letter, Shuanghekou (157 KB)


- registration request form (250 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (201 KB) authorization (201 KB)
Authorized Participants: Liangshan Shuanghekou Electric Power Development Co., Ltd.
Other Parties Involved Japan , involved indirectly approval (58 KB) authorization (58 KB)
Authorized Participants: Energy Initiative Japan, Inc. (withdrawn)
United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (82 KB) authorization (82 KB)
Authorized Participants: Macquarie Bank Limited (withdrawn as of 17/11/2017)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 10 - Consolidated methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 83,398 metric tonnes CO2 equivalent per annum
Fee level USD 15179.6
Validation Report Validation report (600 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Modalities of Communication valid as of 20/11/2017
MoC Annex 2 (Withdraw Project Participant (Voluntary)) valid as of 17/11/2017
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 17/11/2017
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 15/11/2013
MoC Annex 2 (Withdraw Project Participant) valid as of 09/11/2012
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 30/10/2012
MoC Annex 2 (Add Project Participant) valid as of 17/11/2011
Registration Date 14 May 11   (view history)  
Crediting Period 14 May 11 - 13 May 18 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation