Project 2429 : Yunnan Xinya River 3rd Level Hydropower Project
Project title Yunnan Xinya River 3rd Level Hydropower Project
- project design document (597 KB)

PDD appendices
Appendix 1 - Xinya Financial analysis (60 KB)
Appendix 2 - Xinya Emission Factor (142 KB)
Appendix 3 - Xinya Construction Contract (1302 KB)
Appendix 4 - Xinya Management Decision Chinese (76 KB)
Appendix 5 - Xinya Management Decision English (36 KB)
Appendix 6 - Xinya Refuse Loan Letter (955 KB)
Appendix 7 - Xinya Start of Construction (144 KB)


- registration request form (470 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (80 KB) authorization (80 KB)
Authorized Participants: Yunnan Cangyuan Huatong Hydropower Development Co., Ltd.
Other Parties Involved Sweden , involved indirectly approval (366 KB) authorization (366 KB)
Authorized Participants: EcoSecurities Group PLC (withdrawn)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodologies Used AMS-I.D. ver. 13 - Grid connected renewable electricity generation
Standardized baselines used N/A
Amount of Reductions 33,892 metric tonnes CO2 equivalent per annum
Fee level USD 5278.4
Validation Report Validation report (1044 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Modalities of Communication valid as of 05/02/2014
MoC Annex 2 (Withdraw Project Participant) valid as of 07/02/2014
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 23/08/2013
Registration Date 29 May 09   (view history)  
Crediting Period 29 May 09 - 28 May 16 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation