Project: 1759 Shuangbai Ejia Magahe River Hydropower Project - Crediting Period Renewal Request
[]
Project 1759: Shuangbai Ejia Magahe River Hydropower Project

- project design document (543 KB)

PDD appendices
Appendix 1 - Shuangbai Ejia Magahe River Hydropower Project(1759)-ER sheet-V07 (27 KB)

- crediting period renewal form (111 KB)
Methodologies Used AMS-I.D. ver. 18 - Grid connected renewable electricity generation
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 23,569 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (306 KB)
Renewal Date 05 Dec 20 (Renewable - Expired)   (view history)   completeness check info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 24 Dec 15 - 23 Dec 22

Other crediting period(s): 24 Dec 08 - 23 Dec 15
Requests for Issuance
and related documentation