Project: 1190 Pingwu Renjiaba 12.6 MW Small Hydropower Project, P.R.China - Crediting Period Renewal Request
[]
Project 1190: Pingwu Renjiaba 12.6 MW Small Hydropower Project, P.R.China

- project design document (1029 KB)

PDD appendices
Appendix 1 - 1190 CER Calculation_RenewCP (96 KB)

- crediting period renewal form (785 KB)
Methodologies Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
VVS Version
Standardized baselines used N/A
Amount of Reductions 47,923 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (544 KB)
Renewal Date 23 Jul 14 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 17 Sep 14 - 16 Sep 21

Other crediting period(s): 17 Sep 07 - 16 Sep 14
Requests for Issuance
and related documentation