M-DEV0201: Deviation for the measurement requirements for the COD removed parameter in the baseline

Reference M-DEV0201
Submitted by DNV (03 Feb 2009)
Concerned methodology
Draft PDD Draft Project Design Document (756 KB)
Request

Request for deviation form (46 KB)

Link to relevant documentation

EB guidance Deviation for the measurement requirements for the COD removed parameter in the baseline (82 KB)