Grid connected super-critical technology based power generation in Tirora, India
[]
Host party(ies) India
Methodology(ies) ACM0013 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 1,108,404
Start date of first crediting period. 01 Sep 12
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 09 Apr 10 - 08 May 10
PP(s) for which DOE have a contractual obligation Adani Power Maharashtra Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (638 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (76 KB) Submitted by: Guido Sabatini

Comment (429 KB) Submitted by: Ben Pearson


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs