Xinjiang Wuqia County Zongheng Small Hydropower Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 36,194
Start date of first crediting period. 01 Mar 13
Length of first crediting period. 7 years
DOE/AE LGAI Technological Center, S.A.
Period for comments 17 Aug 12 - 15 Sep 12
PP(s) for which DOE have a contractual obligation Xingjiang Wuqia County Zongheng Hydropower Development Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (601 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs