51 MW Solar Power Project at Charanka, Gujarat
[]
Host party(ies) India
Methodology(ies) ACM0002 ver. 16
Standardised Baselines N/A
Estimated annual reductions* 76,751
Proposed start date of PA 11 Nov 14
Start date of first crediting period. 01 Feb 16
Length of first crediting period. 7 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 17 Dec 15 - 15 Jan 16 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation Torrent Solargen Limited (formerly known as Torrent Power Bhiwandi Limited)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (632 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs