Utilisation of Waste heat from Hot Briquetted Iron (HBI) plant at Hazira to produce power for captive consumption of Essar Steel Limited
[]
Host party(ies) India
Methodology(ies) ACM0012 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 122,363
Start date of first crediting period. 30 Oct 10
Length of first crediting period. 10 years
DOE/AE RINA Services S.p.A.
Period for comments 04 Nov 09 - 03 Dec 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (394 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1>>In page6, condensor cooling water inlet temperature in DegC is shown as 70%. Please clarify.
2>> In page 19, the price of coal for calorific value 7000 Kcal/kg is shown as INR 1955/ Ton. Please clarify regarding such a cheap costing of coal. 
Thanks, Sauvik Banerjee 
Submitted by: sauvik banerjee


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs