Methane Recovery and Utilisation at Musim Mas Group Palm Oil Mill at PT. Berkat Sawit Sejati, Musi Banyuasin, Palembang, South Sumatra, Indonesia
[]
Host party(ies) Indonesia
Methodology(ies) AMS-III.H. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 54,401
Start date of first crediting period. 01 Sep 12
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 13 Aug 11 - 11 Sep 11
PP(s) for which DOE have a contractual obligation PT. Berkat Sawit Sejati
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (632 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs