SDIC Dunhuang First Phase and Second Phase Bundled Grid-connected Photovoltaic Power Generation Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 28,288
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE Germanischer
Period for comments 21 Jul 12 - 19 Aug 12
PP(s) for which DOE have a contractual obligation Arreon Carbon Trading Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (934 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs