Song Bac Hydropower Project
[]
Host party(ies) Viet Nam
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 94,354
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 10 years
DOE/AE TUEV-RHEIN
Period for comments 24 Aug 11 - 22 Sep 11
PP(s) for which DOE have a contractual obligation Song Bac Hydropower Joint Stock Company
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (462 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (334 KB) Submitted by: Tran Minh Tuyen


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs