Guangxi Daxin Xialei Small Hydropower Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 26,342
Start date of first crediting period. 01 May 13
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 17 Jan 12 - 15 Feb 12
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1140 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project was already under construction in 2010 (http://www.dxslfd.com/about.asp?id=215 or http://cc.bingj.com/cache.aspx?q=%22%E5%9C%A8%E5%BB%BA%E5%B7%A5%E7%A8%8B%E4%B8%8B%E9%9B%B7%E6%B0%B4%E7%94%B5%E7%AB%99%22&d=4896014053802684&mkt=zh-CN&setlang=zh-CN&w=3aeccf8b,dbd3e21b). Moreover estimated net power supply in PDD is very low (http://www.365zhanlan.com/biz/detail-201325.html).
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs