El Paso 30 MW Hydropower Project, Las Damas River, Chile
[]
Host party(ies) Chile
Methodology(ies) AM0026 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 64,872
Start date of first crediting period. 31 Mar 11
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 15 Oct 08 - 13 Nov 08
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (791 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Table 4 page 18. The PDD reports an IRR of 15.38% without CDM assistance. Based on this additionality should be established relative to applicable hurdle rate for type of activity in Chile- the IRR seems to be sufficient without CDM being required.
Submitted by: Michael Brown


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs