Sichuan Toudaoqiao 10MW Hydropower Project of China
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 32,467
Start date of first crediting period. 01 Jan 14
Length of first crediting period. 7 years
DOE/AE Germanischer
Period for comments 21 Sep 11 - 20 Oct 11
PP(s) for which DOE have a contractual obligation ACT Carbon Capital Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (528 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Total investment is 80 million CNY (http://www.scbid.com/zh/asite39/web_show_677288.shtml). VAT rate is 6% (Caishui[2009]9, State Administration of Taxation) for small hydro projects, i.e. installed capacity below 50 MW. According to Annex A of Economic evaluation code for small hydropower projects (SL 16-2010; updated version to replace SL 16-95), IRR calculation can be derived from formulae A.0.3-1. When applying indicated values in PDD together with real investment cost (taken as total static investment which leads to a lower IRR value) and VAT rate, IRR is 10.08%, already above benchmark.
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs