Baoding Landfill Gas Recovery and Utilization Project in Hebei Province
[]
Host party(ies) China
Methodology(ies) AMS-III.G. ver. 6
AMS-I.D. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 54,087
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE Germanischer
Period for comments 05 Mar 10 - 03 Apr 10
PP(s) for which DOE have a contractual obligation BKW FMB Energie AG
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1091 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
It is unclear with what kind of consideration to request CDM revenue before the project owner recoganize the low investment return. In reality CDM was considered in Sep. 2008 by the project owner when signing project cooperation agreement with local government.
Submitted by: tianmaiqi


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs