Shanghai Waigaoqiao coal-fired power project using a less GHG intensive
[]
Host party(ies) China
Methodology(ies) ACM0013 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 451,575
Start date of first crediting period. 01 May 09
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 31 Oct 08 - 29 Nov 08
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (495 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
please check the conclusion of the baseline on P12, it's not consistent to the p17, which says " the most likely baseline scenario
under “Identification of the baseline scenario” (2*600MW sub-critical coal-fired power
generation technology) section above". 
Submitted by: panxiujiang


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs