Huadian Inner Mongolia Naiman Banner First Phase 49.5MW Wind Power Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 117,800
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE Germanischer
Period for comments 08 Mar 11 - 06 Apr 11
PP(s) for which DOE have a contractual obligation Arreon Carbon Trading Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (575 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project was in construction from 2009 September (source: http://www.naimanqi.gov.cn/?action-viewnews-itemid-1537). Notification was made over 1 year later, 2010 December.
Submitted by: fengdian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs