Niger Acacia Senegal Plantation Project
[]
Host party(ies) Niger
Methodology(ies) AR-AM0004 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 31,975
Start date of first crediting period. 27 Apr 06
Length of first crediting period. 30 years
DOE/AE ErnstYoung
Period for comments 24 Jan 12 - 08 Mar 12
PP(s) for which DOE have a contractual obligation International Bank for Reconstruction and development as trustee of the BioCarbon Fund
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (9591 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
i) The losses due to pruning has not been estimated in ex-ante calculations of net removals

ii) The pre-existing woody vegetation within the project area needs to be accounted for as per relevant CDM guidelines 
Submitted by: Abhirup Sen


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs