Sable Chemicals Tertiary N2O Abatement Project in Zimbabwe
[]
Host party(ies) Zimbabwe
Methodology(ies) AM0028 ver. 5
Standardised Baselines N/A
Estimated annual reductions* 489,778
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 23 Sep 11 - 22 Oct 11
PP(s) for which DOE have a contractual obligation Standard Bank Plc
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (4567 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (291 KB) submitted by: Christopher Brandt on behalf of Climate Concept Foundation


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs