Perdana Methane Capture Project
[]
Host party(ies) Indonesia
Methodology(ies) AMS-III.H. ver. 16
AMS-I.A. ver. 14
Standardised Baselines N/A
Estimated annual reductions* 58,625
Start date of first crediting period. 01 Mar 12
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 02 Apr 11 - 01 May 11
PP(s) for which DOE have a contractual obligation Ministry of Climate and Energy,Danish Energy Agency, Denmark(indirectly)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (541 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Section B.6.1 page 16 addresses incomplete BEy equation   if methodology refers  BEy includes 5 sub component which has not been taken into account in baseline  emission.
Section B.5 page 12 – prior CDM consideration information to the executive Board has been given on 3rd Feb  2010  , however when organisation decided  to  avail CDM benefits doesn’t reflect in this section. On the contrary page 17 mentioned that  plant has been operated since 2006
Submitted by: Pragya Kaushik


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs