Utilisation of Waste Heat for Chilled Water & Fuel Switch to Natural Gas (NG) for power generation at Panoli Intermediates India Private Limited
[]
Host party(ies) India
Methodology(ies) AMS-II.D. ver. 10
AMS-III.B. ver. 11
Standardised Baselines N/A
Estimated annual reductions* 4,846
Start date of first crediting period. 01 Nov 07
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 14 Aug 07 - 12 Sep 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website