15 MW wind project activity in Karnataka
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 28,013
Start date of first crediting period. 01 Apr 12
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 17 Jun 11 - 16 Jul 11
PP(s) for which DOE have a contractual obligation Core CarbonX Solutions Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (587 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
 	DOE to be more careful so that this is a genuine CDM project. What is the exact project cost? The project cost is covering what? Each value considered must be validated with proof. The machinery is second hand purchased or fresh and new from an OEM? In either case DOE to check all the quotations, proposals, purchase orders, invoices, way bills, transport bills, proof of payments like bank statements. DOE to check with banks by way of written confirmation the amount transacted, to whom the money is paid, when the money is paid, is the party paid is the correct party as shown in the purchase orders. It may so happen that the values, party names, dates are fabricated and misrepresented in this project. DOE should terminate their contract for this project immediately. This is the only way out to protect the value of CDM process. If the PP is purchasing second hand or second quality equipment and inflating the purchase order values and invoices, this must be probed thoroughly and real values to taken for additionality calculation. Then I’m sure the additionality is not there at all in such a situation.

 	 How is the base line defined in this project? Is Base line hypothetically defined with no proper evidences and proper justification? In such case, DOE cannot take the base line as suggested by the PDD.  Please check that there are real emission reductions beyond the real and factual base line. It may so happen that this project qualifies for no CER’s. DOE cannot assume values and things as giving by this PP. Whatever values are considered throughout the project in all documents including the real DPR (not the one prepared for CDM, the one given to the banks and others), they must be validated, verified and double checked. Do not ask PP for DPR. Ask the parties who have been given DPR by the PP. Get directly from the bank and others by each page of the DPR and Feasibility report signed. Such document can be considered as a real DPR or FR. UNFCCC CDM process cannot be degraded by fabricating and misinterpreting the project base line and additionality.  


 	Has the PP considered the CDM revenues while envisaging the project? Without CDM the project was not viable, is it right? This project is having a debt component? Then how bankers or lenders gave the loan? Have the bankers or lenders considered the CDM revenues while agreeing to give loan to this projects? If not this project should be rejected right away by DOE by terminating the contract forthwith. If yes, where is the proof? What is the date of the evidence document from bank? Is this document printed now a days or earlier. DOE to independently check the same. If the document is  available from Bank it must be checked from all angles so that it is genuine and not forged and date changed by putting back dated. This is normally done, DOE to be aware of this please. Please check the communication the PP had during that time with banks, emails and postal receipts and the weights and dates mentioned on the receipts. Do not believe in courier bills and receipts since these can be cooked up easily. Insist on government owned postal service receipts only. If the project is fully equity project then on what basis the PP has invested full equity in to the project while considering the CDM revenue? DOE to check the same in detail and bring out the facts. Is there any past record of this PP to invest or not to invest at returns what he is talking about in this project? Proper evidences must be reviewed and digged out by the DOE and take decision on the project based on established facts. Do not ask documents from PP, DOE to collect the same from different sources to do independent evaluation. 

 	Is the project equipment purchased second hand equipment or sourced from cheap foreign sources? If yes, the issue must be probed by DOE since invoices will invariably be inflated and forged. Total project costs mentioned by PP will not be the same as originals. Hence no additionality. These facts must be probed in full by DOE by checking all documents and money transactions along with bank statements and certified accounts by a legally acceptable financial analyst. 

 	From DOE side which auditor has done marketing and business development for acquiring this business of validating this project? With whom he or she was co-ordinating at PP or CER buyer? The same person who has done the marketing and business development to acquire the business do validation or participate in any manner what so ever in the validation process? One cannot do like that. It is against the accreditation rules and norms followed since ages. DOE should send auditors from different offices or countries to do this validation audit. DOE must take care of impartiality and accreditation rules. Due to the targets set by the DOE managements auditors are doing marketing and meeting clients and giving promises that the project will be taken care. Is it acceptable and fair? This must be stopped. No auditor should do marketing. Only non-auditing staff should do marketing. DOE to ensure the same please. 


 	If applicable only: Is these machines, equipment was a part of any bundle of CDM activity envisaged and developed earlier. DOE to check the same through independent sources also. Once some bundles are non-additional and getting negative validation from a DOE, PP is rolling out the same project as an individual project which is not a CDM project at all. DOE to verify the same from independent sources and also take undertaking in the form of an affidavit from the PP’s that any misrepresentation or false statement with respect this would attract strict legal action from UNFCCC and DOE. Furthermore the registered project must be de-registered in case of any future findings contradicting the submissions made by the project owner.  

 	DOE to ensure that the PDD values are consistent and ensure that the CDM project is a genuine project
 	DoE to check the Detailed Project Report and Feasibility Report which is submitted to the other agencies and Banks by Project owner and ensure that the values match with the DPR/FR  submitted to DoE also. 
 	Careful study must be done so that the DPR/FR is not in different versions made and submitted with different purposes to different agencies, which is totally unacceptable, illegal and unethical. 
 	Project owner should show some undertaking letter from bank manager to DoE stating that both DPR’s are same. These kinds of letters should not be accepted and entertained by DoE at face value, but must be checked independently. While collecting the DPR/FR from banks and other agencies, all DPR/FR pages should be counter signed by Banks and other agencies so that the real DPR/FR given to other parties by the PP/Consultant is same as the one submitted to DOE. 
 	DPR/FR values must be probed fully. DOE must take a written undertaking from the PP/Consultant about the list of parties to whom this DPR/FR is submitted and for what purposes. Then DOE should cross check with all the parties and confirm that the same DPR/FR is submitted to all the parties correctly without any changes. DOE must not accept any reports and undertakings from PP/Consultant. DOE must make independent evaluation and use totally different parties without informing the PP or Consultant to cross check the facts. 
 	DOE to write to the party who prepared the DPR/FR which is submitted to the banks and other agencies and the same is verified against the one submitted to the DOE by PP/Consultant. 
 	DOE must not entertain this project any more if found the DPR/FR is tamprered with at any point in time. PP can not give different DPR’s and FR’s. They must submit only the one given to Banks and other agencies while obtaining loans and decision making time. 

Submitted by: sud

1)	Purpose of the project and how the proposed project activity reduces greenhouse gas emissions are not briefed in the PDD. Refer section A.2.
2)	How environmentally safe and sound technology is used for the project and details of technology transfer is not demonstrated adequately. Refer A.4.2
3)	Non- debundling nature of the project activity is not adequately justified as per EB54 Annex 13 (Debundling tool). Refer A.4.5.
4)	Please check the project boundary of the project activity is not based on the guidance of the applicable project category.
5)	Why has option A (Combined margin) been chosen for calculating emission factor is not justified. Refer B.6
6)	The justification of choosing IRR as financial indicator is not adequately justified. Whether it is equity or project IRR, pre-tax or post tax is not mentioned in the PDD. 
7)	The emission factor for the project electricity system can be calculated either for grid power plants only or, as an option, can include off-grid power plants.
8)	Basis of choosing PLR as benchmark is not adequately demonstrated in the PDD 
9)	All the issues of investment analysis guidelines are not discussed in the PDD. Refer B.5. 
10)	Justification of parameters including O&M, insurance, loan, derating, escalation, and tariff are not demonstrated with justification. Refer B.5.
11)	Please provide a proof for proposed debt to equity taken at the investment decision. Refer B.5 
12)	Proof for PLF is not justified. 
13)	Date of offer is not provided  
14)	Project cost is not as per state norms. Refer B.5.
15)	O&M charges and its escalation is not as per  norms 
16)	IT rate assumed is not as per standard practice. 
17)	The application of MAT which is based on tax holiday while calculating WACC is not appropriate. 
18)	The PP has not explained and justified the key assumptions and rationale.
19)	The PP and consultant has not Illustrate in a transparent manner all data used to determine the baseline emissions.
20)	Not demonstrated that the proposed project activity is additional as per options provided under attachment A to Appendix B of the simplified modalities and procedures for small-scale CDM project activities.
21)	National policies and circumstances relevant to the baseline of the proposed project activity are not being summarized clarify.
22)	Explain and justify all relevant methodological choices for the proposed project activity
23)	Data that is calculated with equations provided in the approved category or default values specified in the category should not be included in the compilation.
24)	CER revenue assumed is not consistently applied 
25)	Project cost is not as per  norms, DOE has to check and clarify.
26)	The project cost of the project should be based on offer and not on purchase order or tariff order.
27)	O&M charges considered are on higher side. Pls. clarify. 
28)	Benchmark calculation is not as per WACC tool (EB53 Annex 8)
29)	Whether pre-tax or post tax IRR is selected is not demonstrated in the PDD.
30)	The basis of calculation of benchmark is not documented in the section B.5. PLR is not acceptable benchmark for the project. WACC based on Government bonds, risk premiums should be taken.
31)	Prior consideration of CDM which is important for the determination of additionality is not documented in the section B.5 of the PDD.  
32)	Date of PPA is not mentioned in the prior consideration of CDM 
33)	The selection of simple OM based on low cost/must run resources is not adequately justified. Refer B.6.1
34)	PP has not provided for each parameter the chosen value or, where relevant, the qualitative information.
35)	Please Provide the actual value applied. Where time series of data is used, where several measurements are undertaken or where surveys have been conducted, provide detailed information.
36)	Explain and justify the choice for the source of data.
37)	Ex-ante option of calculating OM is not adequately demonstrated. Step 3 of Refer B.6.1
38)	Power plants registered as CDM project activities should be included in the sample group that is used to calculate the operating margin if the criteria for including the power source in the sample group apply. This argument is not demonstrated. B.6.1
39)	The selection of option (out of two) for calculating OM is not adequately documented with justification. CEA calculation is based on net electricity generation, the average efficiency of each power unit and the fuel types used in each power unit. Step 4 of B.6.1
40)	The argument that CEA data for build margin is calculated as per Emission factor tool is not documented.  B.6.1
41)	Spread sheet is not provided. The data should be presented in a manner that enables reproducing of the calculation of OM, BM, and CM. 
42)	The justification of negligible project emissions for wind project is not as per AMS. I. D ver 16.0 EB 54). 
43)	The emission factor value (Southern grid) for calculating baseline emission is wrong. Refer B.6.3
44)	Net electricity should be continuously monitored, hourly measured and at least monthly recorded. Refer B.7.1
45)	Metering regulations as per CEA norms is not adequately followed in monitoring plan. Refer B.7.2.
46)	 Where the values have been measured, include a description of the measurement methods and procedures that comply with the guidance provided under general guidance.
47)	Provide a detailed description of the monitoring plan, including an identification of the data to be monitored and the procedures that will be applied during monitoring.
48)	The PP should include sources of data that will be actually used for the proposed project activity (e.g. which exact national statistics, actual measurement etc. ).
49)	Where the parameters are to be measured in accordance with the guidance of the approved project category or the general guidance to the indicative methodologies, specify the measurement methods and procedures including accepted industry standards or national or international standards which will be applied, which measurement equipment is used, how the measurement is undertaken.
50)	Which calibration procedures are applied, what is the accuracy of the measurement method, who is the responsible person / entity that should undertake the measurements and what is the measurement interval?
51)	Please provide a detailed description of the monitoring plan. Describe the operational and management structure that the project operator will implement in order to monitor emission reductions.
52)	Clearly indicate the responsibilities for and institutional arrangements for data collection and archiving.
53)	The monitoring plan should reflect good monitoring practice appropriate to the type of project activity. Provide any relevant further background information.
54)	Please describe the process by which comments by local stakeholders have been invited and compiled. An invitation for comments by local stakeholders shall be made in an open and transparent manner, in a way that facilities comments to be received from local stakeholders and allows for a reasonable time for comments to be submitted.
Submitted by: lawrance

1)	Purpose of the project and how the proposed project activity reduces greenhouse gas emissions are not briefed in the PDD. Refer section A.2.
2)	How environmentally safe and sound technology is used for the project and details of technology transfer is not demonstrated adequately. Refer A.4.2
3)	Non- debundling nature of the project activity is not adequately justified as per EB54 Annex 13 (Debundling tool). Refer A.4.5.
4)	Please check the project boundary of the project activity is not based on the guidance of the applicable project category.
5)	Why has option A (Combined margin) been chosen for calculating emission factor is not justified. Refer B.6
6)	The justification of choosing IRR as financial indicator is not adequately justified. Whether it is equity or project IRR, pre-tax or post tax is not mentioned in the PDD. 
7)	The emission factor for the project electricity system can be calculated either for grid power plants only or, as an option, can include off-grid power plants.
8)	Basis of choosing PLR as benchmark is not adequately demonstrated in the PDD 
9)	All the issues of investment analysis guidelines are not discussed in the PDD. Refer B.5. 
10)	Justification of parameters including O&M, insurance, loan, derating, escalation, and tariff are not demonstrated with justification. Refer B.5.
11)	Please provide a proof for proposed debt to equity taken at the investment decision. Refer B.5 
12)	Proof for PLF is not justified. 
13)	Date of offer is not provided  
14)	Project cost is not as per state norms. Refer B.5.
15)	O&M charges and its escalation is not as per  norms 
16)	IT rate assumed is not as per standard practice. 
17)	The application of MAT which is based on tax holiday while calculating WACC is not appropriate. 
18)	The PP has not explained and justified the key assumptions and rationale.
19)	The PP and consultant has not Illustrate in a transparent manner all data used to determine the baseline emissions.
20)	Not demonstrated that the proposed project activity is additional as per options provided under attachment A to Appendix B of the simplified modalities and procedures for small-scale CDM project activities.
21)	National policies and circumstances relevant to the baseline of the proposed project activity are not being summarized clarify.
22)	Explain and justify all relevant methodological choices for the proposed project activity
23)	Data that is calculated with equations provided in the approved category or default values specified in the category should not be included in the compilation.
24)	CER revenue assumed is not consistently applied 
25)	Project cost is not as per  norms, DOE has to check and clarify.
26)	The project cost of the project should be based on offer and not on purchase order or tariff order.
27)	O&M charges considered are on higher side. Pls. clarify. 
28)	Benchmark calculation is not as per WACC tool (EB53 Annex 8)
29)	Whether pre-tax or post tax IRR is selected is not demonstrated in the PDD.
30)	The basis of calculation of benchmark is not documented in the section B.5. PLR is not acceptable benchmark for the project. WACC based on Government bonds, risk premiums should be taken.
31)	Prior consideration of CDM which is important for the determination of additionality is not documented in the section B.5 of the PDD.  
32)	Date of PPA is not mentioned in the prior consideration of CDM 
33)	The selection of simple OM based on low cost/must run resources is not adequately justified. Refer B.6.1
34)	PP has not provided for each parameter the chosen value or, where relevant, the qualitative information.
35)	Please Provide the actual value applied. Where time series of data is used, where several measurements are undertaken or where surveys have been conducted, provide detailed information.
36)	Explain and justify the choice for the source of data.
37)	Ex-ante option of calculating OM is not adequately demonstrated. Step 3 of Refer B.6.1
38)	Power plants registered as CDM project activities should be included in the sample group that is used to calculate the operating margin if the criteria for including the power source in the sample group apply. This argument is not demonstrated. B.6.1
39)	The selection of option (out of two) for calculating OM is not adequately documented with justification. CEA calculation is based on net electricity generation, the average efficiency of each power unit and the fuel types used in each power unit. Step 4 of B.6.1
40)	The argument that CEA data for build margin is calculated as per Emission factor tool is not documented.  B.6.1
41)	Spread sheet is not provided. The data should be presented in a manner that enables reproducing of the calculation of OM, BM, and CM. 
42)	The justification of negligible project emissions for wind project is not as per AMS. I. D ver 16.0 EB 54). 
43)	The emission factor value (Southern grid) for calculating baseline emission is wrong. Refer B.6.3
44)	Net electricity should be continuously monitored, hourly measured and at least monthly recorded. Refer B.7.1
45)	Metering regulations as per CEA norms is not adequately followed in monitoring plan. Refer B.7.2.
46)	 Where the values have been measured, include a description of the measurement methods and procedures that comply with the guidance provided under general guidance.
47)	Provide a detailed description of the monitoring plan, including an identification of the data to be monitored and the procedures that will be applied during monitoring.
48)	The PP should include sources of data that will be actually used for the proposed project activity (e.g. which exact national statistics, actual measurement etc. ).
49)	Where the parameters are to be measured in accordance with the guidance of the approved project category or the general guidance to the indicative methodologies, specify the measurement methods and procedures including accepted industry standards or national or international standards which will be applied, which measurement equipment is used, how the measurement is undertaken.
50)	Which calibration procedures are applied, what is the accuracy of the measurement method, who is the responsible person / entity that should undertake the measurements and what is the measurement interval?
51)	Please provide a detailed description of the monitoring plan. Describe the operational and management structure that the project operator will implement in order to monitor emission reductions.
52)	Clearly indicate the responsibilities for and institutional arrangements for data collection and archiving.
53)	The monitoring plan should reflect good monitoring practice appropriate to the type of project activity. Provide any relevant further background information.
54)	Please describe the process by which comments by local stakeholders have been invited and compiled. An invitation for comments by local stakeholders shall be made in an open and transparent manner, in a way that facilities comments to be received from local stakeholders and allows for a reasonable time for comments to be submitted.
Submitted by: lawrance

The Proposed project activity with a start date before 2 August 2008, for which the start date is prior to the date of publication of the PDD for global stakeholder consultation, are required to demonstrate that the CDM was seriously considered in the decision to implement the project activity. If your project does not comes under this category please ignore the relevant comments as given below:
1)	It looks like from the PDD the start date of the project is tampered. This must be verified and let the truth come out. The culprits of forgery and malpractices must be brought to book if it happened. If found the dates are tampered, the DOE must terminate this project immediately. DOE to check the offer letters originals and get the same verified in writing from the OEM’s and submitted parties. Where is the OEM supplier agreement original? DOE to check for the same. Is it prepared later with date and amounts changed to suit the project workings? If yes, this is not acceptable. DOE to check all purchase orders originals with the receiver of purchase orders i.e. the supplier of equipment. This PO confirmation to the DOE must be in writing from a board level person of the equipment supplier to avoid any malpractices and forgery. Then DOE to check for the invoices dates, payment amounts and date of payments made with all original documents and reconfirm with the parties involved and the banks for the accuracy of amounts, dates and parties involved. 
2)	Same analysis and due diligence work to be repeated for “Notice to Proceed” as written in the case of Purchase order as above. DOE to check all “Notice to Proceed” originals with the receiver of “Notice to Proceed” i.e. the supplier of equipment or Engineering Procurement & Construction Contractor. This “Notice to proceed” and EPC contract confirmation to the DOE must be in writing from a board level person of the equipment supplier and EPC contractor to avoid any malpractices and forgery. Then DOE to check for the invoices dates, payment amounts and date of payments made with all original documents and reconfirm with the parties involved and the banks for the accuracy of amounts, dates and parties involved. DOE to check OEM supplier agreements, EPC contractor agreements, “Notice to proceed” letters, and Invoices raised. I’m sure DOE will unearth the real story of what happened in this project. All the parties involved in this matter must be brought to justice if found guilty. DOE cannot afford to simply keep validating these kind of old projects just like that. 
3)	Is PP showing ERPA as a part of real and continuous action? If yes, How come the PP is showing an ERPA and telling that there is real and continuous action? In what way PP can prove that the ERPA what is mentioned is genuine? This ERPA is dated what? Are there any emails exchanged during those ERPA signing days between PP and CER Buyer? Let PP show the real evidence that this particular ERPA was really signed on that date by showing the exchange of emails during those days. Any government owned postal receipt copies to prove the transmission of documents?  Any way EPRA has no meaning even if they prove that ERPA was signed those days. ERPA is not a concluding evidence to show real and continuous action. Why the party has not signed any validation agreement with a DOE? Do they have a signed CDM validation agreement with any DOE? If yes, have they paid money to DOE so that we can conclusively prove that PP has considered CDM and serious real and continuous action was there. If the PP has not paid to the DOE the advance amount towards CDM validation, then we can conclusively say that no real and continuous action in this project at all. In such case, this project does not merit any further validation, DOE must tell the PP to with draw the project from CDM. Alternatively DOE should issue a negative validation report and protect their reputation and future. When did PP apply for host country approval? Why delay? DOE to probe fully. Is it a case where PP has never considered CDM revenue to establish the project? Is it case, where one consultant must have given this fraud idea of applying for CDM revenues when the PP has almost forgot the project activity itself since it is a done project without envisaging any CDM revenues? DOE must be careful in taking up this kind of projects. What due diligence and checks the DOE has done prior to accepting this job? 
Submitted by: sud

The Proposed project activity with a start date before 2 August 2008, for which the start date is prior to the date of publication of the PDD for global stakeholder consultation, are required to demonstrate that the CDM was seriously considered in the decision to implement the project activity. If your project does not comes under this category please ignore the relevant comments as given below:
1)	It looks like from the PDD the start date of the project is tampered. This must be verified and let the truth come out. The culprits of forgery and malpractices must be brought to book if it happened. If found the dates are tampered, the DOE must terminate this project immediately. DOE to check the offer letters originals and get the same verified in writing from the OEM’s and submitted parties. Where is the OEM supplier agreement original? DOE to check for the same. Is it prepared later with date and amounts changed to suit the project workings? If yes, this is not acceptable. DOE to check all purchase orders originals with the receiver of purchase orders i.e. the supplier of equipment. This PO confirmation to the DOE must be in writing from a board level person of the equipment supplier to avoid any malpractices and forgery. Then DOE to check for the invoices dates, payment amounts and date of payments made with all original documents and reconfirm with the parties involved and the banks for the accuracy of amounts, dates and parties involved. 
2)	Same analysis and due diligence work to be repeated for “Notice to Proceed” as written in the case of Purchase order as above. DOE to check all “Notice to Proceed” originals with the receiver of “Notice to Proceed” i.e. the supplier of equipment or Engineering Procurement & Construction Contractor. This “Notice to proceed” and EPC contract confirmation to the DOE must be in writing from a board level person of the equipment supplier and EPC contractor to avoid any malpractices and forgery. Then DOE to check for the invoices dates, payment amounts and date of payments made with all original documents and reconfirm with the parties involved and the banks for the accuracy of amounts, dates and parties involved. DOE to check OEM supplier agreements, EPC contractor agreements, “Notice to proceed” letters, and Invoices raised. I’m sure DOE will unearth the real story of what happened in this project. All the parties involved in this matter must be brought to justice if found guilty. DOE cannot afford to simply keep validating these kind of old projects just like that. 
3)	Is PP showing ERPA as a part of real and continuous action? If yes, How come the PP is showing an ERPA and telling that there is real and continuous action? In what way PP can prove that the ERPA what is mentioned is genuine? This ERPA is dated what? Are there any emails exchanged during those ERPA signing days between PP and CER Buyer? Let PP show the real evidence that this particular ERPA was really signed on that date by showing the exchange of emails during those days. Any government owned postal receipt copies to prove the transmission of documents?  Any way EPRA has no meaning even if they prove that ERPA was signed those days. ERPA is not a concluding evidence to show real and continuous action. Why the party has not signed any validation agreement with a DOE? Do they have a signed CDM validation agreement with any DOE? If yes, have they paid money to DOE so that we can conclusively prove that PP has considered CDM and serious real and continuous action was there. If the PP has not paid to the DOE the advance amount towards CDM validation, then we can conclusively say that no real and continuous action in this project at all. In such case, this project does not merit any further validation, DOE must tell the PP to with draw the project from CDM. Alternatively DOE should issue a negative validation report and protect their reputation and future. When did PP apply for host country approval? Why delay? DOE to probe fully. Is it a case where PP has never considered CDM revenue to establish the project? Is it case, where one consultant must have given this fraud idea of applying for CDM revenues when the PP has almost forgot the project activity itself since it is a done project without envisaging any CDM revenues? DOE must be careful in taking up this kind of projects. What due diligence and checks the DOE has done prior to accepting this job? 
Submitted by: sud

This project is a cooked up CDM project and must to straight away terminated by DOE. Why TUV Nord has taken up this project? What due diligence TUV Nord has done? Where are the records of such review being done? There is no baseline established in this project. Additionality is clearly not demonstrated. Financial figures shown are wrong and cooked up. DOE must check all originals with bank and validate each cell in the excel sheet. There is no real and continuous action for this project. Whatever ERPA or agreement PP shows is fabricated. If DOE checks the communication PP had with ERPA or consultant during those days as per emails truth will come out. If any, the agreements shown between consultant and ERPA buyers are totally forged. DOE must not encourage this kind of forged and cooked up projects. This project must be rejected right away. Who has done the marketing for this project from the DOE side? What understanding he has got with the PP and consultant? How can a DOE undertake to validate this kind project which has no additionality, no real and continuous action with forged figures and dates? This project does not deserve any further validation and needs to be terminated right away by the DOE. 
Submitted by: sud

This project is a cooked up CDM project and must to straight away terminated by DOE. Why TUV Nord has taken up this project? What due diligence TUV Nord has done? Where are the records of such review being done? There is no baseline established in this project. Additionality is clearly not demonstrated. Financial figures shown are wrong and cooked up. DOE must check all originals with bank and validate each cell in the excel sheet. There is no real and continuous action for this project. Whatever ERPA or agreement PP shows is fabricated. If DOE checks the communication PP had with ERPA or consultant during those days as per emails truth will come out. If any, the agreements shown between consultant and ERPA buyers are totally forged. DOE must not encourage this kind of forged and cooked up projects. This project must be rejected right away. Who has done the marketing for this project from the DOE side? What understanding he has got with the PP and consultant? How can a DOE undertake to validate this kind project which has no additionality, no real and continuous action with forged figures and dates? This project does not deserve any further validation and needs to be terminated right away by the DOE. 
Submitted by: sud

	Has the PP considered the CDM revenues while envisaging the project? Without CDM the project was not viable, is it right? This project is having a debt component? Then how bankers or lenders gave the loan? Have the bankers or lenders considered the CDM revenues while agreeing to give loan to this projects? If not this project should be rejected right away by DOE by terminating the contract forthwith. If yes, where is the proof? What is the date of the evidence document from bank? Is this document printed now a days or earlier. DOE to independently check the same. If the document is  available from Bank it must be checked from all angles so that it is genuine and not forged and date changed by putting back dated. This is normally done, DOE to be aware of this please. Please check the communication the PP had during that time with banks, emails and postal receipts and the weights and dates mentioned on the receipts. Do not believe in courier bills and receipts since these can be cooked up easily. Insist on government owned postal service receipts only. If the project is fully equity project then on what basis the PP has invested full equity in to the project while considering the CDM revenue? DOE to check the same in detail and bring out the facts. Is there any past record of this PP to invest or not to invest at returns what he is talking about in this project? Proper evidences must be reviewed and digged out by the DOE and take decision on the project based on established facts. Do not ask documents from PP, DOE to collect the same from different sources to do independent evaluation. 

	Is the project equipment purchased second hand equipment or sourced from cheap foreign sources? If yes, the issue must be probed by DOE since invoices will invariably be inflated and forged. Total project costs mentioned by PP will not be the same as originals. Hence no additionality. These facts must be probed in full by DOE by checking all documents and money transactions along with bank statements and certified accounts by a legally acceptable financial analyst. 

	From DOE side which auditor has done marketing and business development for acquiring this business of validating this project? With whom he or she was co-ordinating at PP or CER buyer? The same person who has done the marketing and business development to acquire the business do validation or participate in any manner what so ever in the validation process? One cannot do like that. It is against the accreditation rules and norms followed since ages. DOE should send auditors from different offices or countries to do this validation audit. DOE must take care of impartiality and accreditation rules. Due to the targets set by the DOE managements auditors are doing marketing and meeting clients and giving promises that the project will be taken care. Is it acceptable and fair? This must be stopped. No auditor should do marketing. Only non-auditing staff should do marketing. DOE to ensure the same please. 


	If applicable only: Is these machines, equipment was a part of any bundle of CDM activity envisaged and developed earlier. DOE to check the same through independent sources also. Once some bundles are non-additional and getting negative validation from a DOE, PP is rolling out the same project as an individual project which is not a CDM project at all. DOE to verify the same from independent sources and also take undertaking in the form of an affidavit from the PP’s that any misrepresentation or false statement with respect this would attract strict legal action from UNFCCC and DOE. Furthermore the registered project must be de-registered in case of any future findings contradicting the submissions made by the project owner.  



	DOE to ensure that the PDD values are consistent and ensure that the CDM project is a genuine project
	DoE to check the Detailed Project Report and Feasibility Report which is submitted to the other agencies and Banks by Project owner and ensure that the values match with the DPR/FR  submitted to DoE also. 
	Careful study must be done so that the DPR/FR is not in different versions made and submitted with different purposes to different agencies, which is totally unacceptable, illegal and unethical. 
	DPR/FR values must be probed fully. DOE must take a written undertaking from the PP/Consultant about the list of parties to whom this DPR/FR is submitted and for what purposes. Then DOE should cross check with all the parties and confirm that the same DPR/FR is submitted to all the parties correctly without any changes. DOE must not accept any reports and undertakings from PP/Consultant. DOE must make independent evaluation and use totally different parties without informing the PP or Consultant to cross check the facts. 
	DOE to write to the party who prepared the DPR/FR which is submitted to the banks and other agencies and the same is verified against the one submitted to the DOE by PP/Consultant. 
	DOE must not entertain this project any more if found the DPR/FR is tamprered with at any point in time. PP can not give different DPR’s and FR’s. They must submit only the one given to Banks and other agencies while obtaining loans and decision making time. 



	 How is the base line defined in this project? Is Base line hypothetically defined with no proper evidences and proper justification? In such case, DOE cannot take the base line as suggested by the PDD.  Please check that there are real emission reductions beyond the real and factual base line. It may so happen that this project qualifies for no CER’s. DOE cannot assume values and things as giving by this PP. Whatever values are considered throughout the project in all documents including the real DPR (not the one prepared for CDM, the one given to the banks and others), they must be validated, verified and double checked. Do not ask PP for DPR. Ask the parties who have been given DPR by the PP. Get directly from the bank and others by each page of the DPR and Feasibility report signed. Such document can be considered as a real DPR or FR. UNFCCC CDM process cannot be degraded by fabricating and misinterpreting the project base line and additionality.  

	DOE to be more careful so that this is a genuine CDM project. What is the exact project cost? The project cost is covering what? Each value considered must be validated with proof. The machinery is second hand purchased or fresh and new from an OEM? In either case DOE to check all the quotations, proposals, purchase orders, invoices, way bills, transport bills, proof of payments like bank statements. DOE to check with banks by way of written confirmation the amount transacted, to whom the money is paid, when the money is paid, is the party paid is the correct party as shown in the purchase orders. It may so happen that the values, party names, dates are fabricated and misrepresented in this project. DOE should terminate their contract for this project immediately. This is the only way out to protect the value of CDM process. If the PP is purchasing second hand or second quality equipment and inflating the purchase order values and invoices, this must be probed thoroughly and real values to taken for additionality calculation. Then I’m sure the additionality is not there at all in such a situation.
	Project owner should show some undertaking letter from bank manager to DoE stating that both DPR’s are same. These kinds of letters should not be accepted and entertained by DoE at face value, but must be checked independently. While collecting the DPR/FR from banks and other agencies, all DPR/FR pages should be counter signed by Banks and other agencies so that the real DPR/FR given to other parties by the PP/Consultant is same as the one submitted to DOE. 
Submitted by: sud

This project is a cooked up CDM project and must to straight away terminated by DOE. Why TUV Nord has taken up this project? What due diligence TUV Nord has done? Where are the records of such review being done? There is no baseline established in this project. Additionality is clearly not demonstrated. Financial figures shown are wrong and cooked up. DOE must check all originals with bank and validate each cell in the excel sheet. There is no real and continuous action for this project. 
Whatever ERPA or agreement PP shows is fabricated. If DOE checks the communication PP had with ERPA or consultant during those days as per emails truth will come out. If any, the agreements shown between consultant and ERPA buyers are totally forged. DOE must not encourage this kind of forged and cooked up projects. This project must be rejected right away. Who has done the marketing for this project from the DOE side? What understanding he has got with the PP and consultant?
 How can a DOE undertake to validate this kind project which has no additionality, no real and continuous action with forged figures and dates? This project does not deserve any further validation and needs to be terminated right away by the DOE. 
Submitted by: sud

It looks like from the PDD the start date of the project is tampered for sure. This must be verified and let the truth come out. The culprits of forgery and malpractices must be brought to book. Why DOE has taken up such a bad project? Is there any pressure on DOE or some cake offered to DOE? They DOE must terminate this project immediately. DOE to check the offer letters originals and get the same verified in writing from the OEM’s and submitted parties. Where is the OEM supplier agreement original? DOE to check for the same. Is it prepared later with date and amounts changed to suit the project workings? For sure yes. This is not acceptable. 
DOE to check all purchase orders originals with the receiver of purchase orders i.e. the supplier of equipment. This PO confirmation to the DOE must be in writing from a board level person of the equipment supplier to avoid any malpractices and forgery. Then DOE to check for the invoices dates, payment amounts and date of payments made with all original documents and reconfirm with the parties involved and the banks for the accuracy of amounts, dates and parties involved. Same analysis and due diligence work to be repeated for “Notice to Proceed” as written in the case of Purchase order as above. DOE to check all “Notice to Proceed” originals with the receiver of “Notice to Proceed” i.e. the supplier of equipment or Engineering Procurement & Construction Contractor. This “Notice to proceed” and EPC contract confirmation to the DOE must be in writing from a board level person of the equipment supplier and EPC contractor to avoid any malpractices and forgery. Then DOE to check for the invoices dates, payment amounts and date of payments made with all original documents and reconfirm with the parties involved and the banks for the accuracy of amounts, dates and parties involved.
 DOE to check OEM supplier agreements, EPC contractor agreements, “Notice to proceed” letters, and Invoices raised. I’m sure DOE will catch the malpractices happened in this project. All the parties involved in this matter must be brought to justice. DOE must not support this kind of forgeries and malpractices. DOE cannot afford to close their eyes to this kind of malpractices. 
Submitted by: sud

It is evident from the PDD that the values are consistent and it is definitely forged and cooked up values to show a non CDM project as a CDM project. What is this? DoE to check the Detailed Project Report and Feasibility Report which is submitted to the other agencies and Banks by Project owner and ensure that the values match with the DPR/FR  submitted to DoE also. After careful study of PDD it is found that DPR/FR is in different versions made and submitted with different purposes to different agencies which is totally unacceptable, illegal and unethical. PP/Consultant may show some undertaking letter from bank manager to DoE stating that both DPR’s are same. These kinds of letters should not be accepted and entertained by DoE. While collecting the DPR/FR from banks and other agencies, all DPR/FR pages should be counter signed by Banks and other agencies so that the real DPR/FR given to other parties by the PP/Consultant is same as the one submitted to DOE. In this particular project there is clear cut evidence that DPR/FR values are changed/ fabricated mischievously and intentionally. This must be probed fully. DOE must take a written undertaking from the PP/Consultant about the list of parties to whom this DPR/FR is submitted and for what purposes. Then DOE should cross check with all the parties and confirm that the same DPR/FR is submitted to all the parties correctly without any changes. DOE must not accept any reports and undertakings from PP/Consultant. DOE must make independent evaluation and use totally different parties without informing the PP or Consultant to cross check the facts. DOE to write to the party who prepared the DPR/FR which is submitted to the banks and other agencies and the same is verified against the one submitted to the DOE by PP/Consultant. This project is a fabricated and fake CDM project and must be rejected by the DOE right away. DOE should not support this kind of projects otherwise CDM EB should suspend this DOE for at least one year. 
Submitted by: sud

This is thoroughly cooked up CDM project. Does not deserve even validation. How come the PP is showing an ERPA and telling that there is real and continuous action? The ERPA what is mentioned is 200% fake and forged. This consultant is the trend setter and record holder in fabricating, forging illegally any documents in CDM process. This ERPA is dated what?

 Are there any emails exchanged during those ERPA signing days between PP and CER Buyer? Let PP show the real evidence that this particular ERPA was really signed on that date by showing the exchange of emails during those days. Sure none will be there. Any way EPRA has no meaning even if they prove that ERPA was signed those days. Why the party has not signed any validation agreement with a DOE? Do they have a signed CDM validation agreement with any DOE? If yes, have they paid money to DOE so that we can conclusively prove that PP has considered CDM and serious real and continuous action was there. If the PP has not paid to the DOE then we can conclusively say that no real and continuous action at all. This project does not merit any further validation, DOE must tell the PP to with draw the project from CDM. 

Alternatively DOE should issue a negative validation report and protect their reputation and future. Why did PP not apply for more than three years for host country approval? The fact is PP has never considered CDM revenue to establish the project. In fact that is evident from the actions. After that some fraud consultant must have given this fraud idea of applying for CDM revenues when the PP has almost forgot the project activity itself since it is a done project. 

DOE must not take this kind of projects at all. This will take the DOE more and closer to suspension and disgrace. Why DOE is taking up this kind of projects? What due diligence and checks the DOE has done prior to accepting this job? Why not take some fresh projects and try to do good work.
Submitted by: sud

If you carefully read through the PDD it is confirmed that this is not a genuine CDM project at all. What is the exact project cost? The project cost is covering what? The machinery is second hand purchased or fresh and new from an OEM? In either case DOE to check all the quotations, proposals, purchase orders, invoices, way bills, transport bills, proof of payments like bank statements. 
DOE to check with banks by way of written confirmation the amount transacted, to whom the money is paid, when the money is paid, is the party paid is the correct party as shown in the purchase orders. It is very clear that the values, party names, dates are fabricated and misrepresented in this project. DOE should terminate their contract for this project immediately. This is the only way out to protect the value of CDM process. It looks like PP is purchasing second hand or second quality equipment by inflating the purchase order values and invoices. This must be probed thoroughly and real values to taken for additionality calculation. Then I’m sure the additionality is not there at all in this project. How is the base line defined in this project? Base line is hypothetically defined with no proper evidences and proper justification. 
DOE cannot take the base line as suggested by the PDD.  Please note that there are no emissions beyond the real and factual base line. This project definitely qualifies for zero CER’s, not even one CER. DOE cannot assume values and things as giving by this PP. Whatever values are considered throughout the project in all documents including the real DPR (not the one prepared for CDM, the one given to the banks and others), they must be validated, verified and double checked. Do not ask PP for DPR. Ask the parties who have been given DPR by the PP. Get directly from the bank and others by each page of the DPR and Feasibulity report signed. Such document can be considered as a real DPR or FR. This project is genuinely a fabricated, false and misinterpreted project with no base line and additionality.  
Submitted by: alexander

The decision making date is not given in the timeline. Therefore, no reader can check the correctness of benchmark. The calculation of return on equity cannot be correct, because the consultant has taken beta of 1.03  while for power projects it is not more than 1. The companies considered for beta calculation, return interval used and the reasons for slecting BSE 500 are not given anywhere in the PDD. The Return on equity is high. When the EB has recommended a return of 11.75% on equity for energy projects, what is the basis for considering 22.35% return on equity as benchmark? It is not clear how the DOE webhosted this PDD even without looking into the conformity of PDD to Additionality Tool and EB recommendation.
 
KERC has recommended a PLF of 26.5% with 0.5% auxiliary consumption. PDD of quite a few projects located at Gadag District have been webhosted with a PLF of 26.5% or even more. On what basis PLF of 23.27% has been given? Since teh project is financed by loan, DOE should check what PLF the PP has given to bank? DOE should check the actual PLF achieved by the wind mills since commencement till June 2011. PP is not correct in giving third party PLF report when it must have given PLF estimation to Bank, without which the bank will not be able to do appraisal.

It is not known whether the terms of loan the PP has assumed is in agreement with Annex 13, EB 61. Consultant has not conveniently given the basis for rate of interest, repayment and grace period 

On what basis the PP is claiming administrative charges of as much as Rs.0.5 mn., which is escalated at 5%? Does KERC provide for such expenditure? When the O&M cost has been provided and the O&M contractor is supposed to look after the windmill including billing, what is the need for administrative expenses? 

Is the depreciation on wind mill 80% or 100%? In the first year, the project is eligible for additional depreciation of 20%. Why is this ignored? The project is also eligible for tax holiday. Whether this is taken into account?

With the given information, the IRR should work out to more than 12.25% for all the projects. The projects are therefore not additional. It is not clear how the Consultant has arrived at 8.91% and 9.07%. If the actual purchase order cost is taken into account, the IRR should be much higher. The calculations are not correct. DOE should use the purchase order cost if it is lower. 

Why is the REC income not taken into account? DOE should put a condition that the additionality will be reviewed if the company claims REC 

It is not known why the common practice analysis is not given for this project as the installed capacity of the bundle is 15 MW 
Submitted by: Karthikeyan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs