Methane recovery at the waste water treatment plant and thermal energy generation with biogas in the rotary lime kiln at Seshasayee Paper Boards Limited
[]
Host party(ies) India
Methodology(ies) AMS-I.C. ver. 14
AMS-III.H. ver. 12
Standardised Baselines N/A
Estimated annual reductions* 28,825
Start date of first crediting period. 01 Nov 09
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 28 Jul 09 - 26 Aug 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (257 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
There seems to be an error in the website regarding annual emission reductions. It has been mentioned that only '10' emission reductions in the website, where as in PDD it is mentioned as '28825' emission reductions. This error needs to be corrected. Otherwise it can lead to a big confusion.
Submitted by: A.R.Ravi Kumar

Comment (44 KB) submitted by: Sonika on behalf of EcoSol


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs