GHG Emission Reduction by Raw Material Replacement in Cement Clinker Production Line of Jixi Chenghai Cement Co., Ltd. in Heilongjiang Province
[]
Host party(ies) China
Methodology(ies) ACM0015 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 56,004
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 28 Aug 10 - 26 Sep 10
PP(s) for which DOE have a contractual obligation Voestalpine AG
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1505 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1. Project area defined as Jixi City is inappropriate as it does not cover an area by a radius of 200km. Neither 10 cement plants nearest.
2. Alternative 2 should be detailed as the plant produces different kinds of cement.
3. The project is not first of its kind. Many cement plants in Heilongjiang province use the similar technology, such as Haolianghe cement plant mentioned in PDD. The plant uses coal ash (a kind of non-carbonated calcium source) as raw materials in production.
4. Investment cost is questioned by a parallel modification project for energy efficiency improvement, which was supported by Beijing Sifanglian Keji Co., Ltd.
Submitted by: yure