CGN Inner Mongolia Huitengliang 300MW Wind Power Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 6
Standardised Baselines N/A
Estimated annual reductions* 685,659
Start date of first crediting period. 01 Mar 08
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 02 Oct 07 - 31 Oct 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website