Pakke Bung-II, Hydro Electric Project in Arunachal Pradesh, India
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 50,760
Start date of first crediting period. 01 Apr 12
Length of first crediting period. 10 years
DOE/AE LRQA Ltd
Period for comments 15 May 12 - 13 Jun 12
PP(s) for which DOE have a contractual obligation EDCL-Seppa Riang Power Pvt Ltd
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (575 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (390 KB) submitted by: sandrp on behalf of Samantha Agarwal, SANDRP

Please consider the following points as a part of the previous comment that we had submitted on Pakke Bung-II.  

-As mentioned in the previous submission, the project in question is part of a series of HEPs (48 MW Pakke Bung I, 15 MW Pakke Bung II, 36 MW Pakke Bung III, and 12 MW Pakke Bung IV, totaling 111 MW), all of which are applying for CDM status via the developer, Energy Development Company Ltd (EDCL). It is conspicuous that the PP evades mention of the series of projects in its PDDs, and more so it fails to mention the distance between the point where the tail race of the upstream project deposits water back to the river and the submergence point of the downstream project.  This is significant as the Ministry of Environment and Forests (India) mandates that at least 1 Km of free flowing river must remain between hydro power projects that occur consecutively on a single river.  Since the project developer hasn’t proven that the four projects are providing the required kilometer of free flowing stream between the dams, the project authority should have applied for CDM jointly.  Since they have not done so, this should immediately disqualify this project from receiving CDM validation. 

-The above comment and the previous submission are jointly endorsed by the following individuals/organizations:
Samantha Agarwal, South Asian Network on Dams, Rivers, and People, sa.sandrp@gmail.com 
Jiten Yumnam, The Citizens' Concern for Dams and Development (CCDD), Imphal, Manipur, jitnyumnam@yahoo.co.in 
Ravindra Nath, Director, Rural Volunteers Center, Village Akajan (Via Silapathar), District Dhemaji, 787059, Assam, assamravi@yahoo.co.in 
Submitted by: sandrp


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs