Methane Capture and Flaring from Addis Ababa Repi open dump fill
[]
Host party(ies) Ethiopia
Methodology(ies) ACM0001 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 46,494
Start date of first crediting period. 01 Apr 13
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 07 Nov 12 - 06 Dec 12
PP(s) for which DOE have a contractual obligation Addis Ababa City Administration (AACA)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (699 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs