Huineng Low Concentration Coal Mine Methane Utilization Project
[]
Host party(ies) China
Methodology(ies) ACM0008 ver. 7
Standardised Baselines N/A
Estimated annual reductions* 357,211
Start date of first crediting period. 01 Oct 12
Length of first crediting period. 10 years
DOE/AE China Environmental United Certification Center Co., Ltd.
Period for comments 26 Apr 12 - 25 May 12
PP(s) for which DOE have a contractual obligation Pingding County Yonder Coal Mine Methane Development Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1523 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs