Weidi Grid-connected Solar PV Power Project in Yongren County
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 52,132
Start date of first crediting period. 01 Mar 13
Length of first crediting period. 7 years
DOE/AE ERM-CVS
Period for comments 31 Jul 12 - 29 Aug 12
PP(s) for which DOE have a contractual obligation Vitol S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (527 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:

The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs