Wind Power Plants Seabra, Novo Horizonte and Macaúbas CDM Project
[]
Host party(ies) Brazil
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 60,670
Start date of first crediting period. 01 Aug 11
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 06 Oct 10 - 04 Nov 10
PP(s) for which DOE have a contractual obligation Macaúbas Energética S.A.
Seabra Energética S.A.
Novo Horizonte Energética S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (723 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs