China Hunan Shanyangxi Small Hydropower Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 27,862
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE China Quality Certification Centre Co., Ltd.
Period for comments 04 Aug 11 - 02 Sep 11
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1100 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
There is an assessment report (http://www.sangzhi.gov.cn/news/%E5%85%B3%E4%BA%8E%E5%AF%B9%E6%B8%B8%E5%8A%B2%E6%98%8E%E5%90%8C%E5%BF%97%E6%9D%A5%E6%A1%91%E6%8C%82%E8%81%8C%E7%9A%84%E8%80%83%E6%A0%B8%E8%AF%84%E4%BB%B7%E6%8A%A5%E5%91%8A.doc) from local government, issued on 24/01/2010, indicating the project construction taken place since October 2009. So the project can be implemented without CDM.
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs