Yunnan Fengchunling 3rd Level Small Hydropower Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 42,040
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 28 Sep 11 - 27 Oct 11
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1083 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project started construction on August 10, 2007 and total investment is 59.035 million CNY, which can be verified at local DRC website (http://www.ynf.gov.cn/canton_model12/newsview.aspx?id=598273). Tariff for hydro projects in Yunnan is 0.215 CNY/kWh. So the project receives sufficient financial return without CDM revenue.
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs